Due to ICE AIR’s ongoing product development programs, the information in this document is subject to change without notice.
13
System Check List
Installer: Complete unit and system checkout and follow unit start-up procedures provided with the unit. Use this form to record information,
temperatures and pressures during start-up. Keep this form for future reference.
Location Information.
Owner:
Address:
Model Number:
Serial Number:
Unit Location in Building:
Date:
Sales Order No:
In order to minimize troubleshooting and costly system failures,
complete the following checks and data entries before the system is
put into full operation.
Temperatures: (Circle) F or C
Antifreeze: __________Type: __________%
Pressures: (Circle) PSIG or kPa
Allow unit to run 15 minutes in each mode before taking data.
Do not connect service manifold gauges during start up unless
instructed by ICE AIR service tech.
Cooling Mode
Heating
Mode
Return-Air Temperature DB (°F)
Supply-Air Temperature DB (°F)
Temperature Differential
Entering Fluid Temperature (°F)
Leaving Fluid Temperature (°F)
Temperature Differential
Water Pressure IN
Water Pressure OUT (PSI)
Pressure Differential (PSI)
Flow Rate (GPM)
Supply Voltage at Contactor (V)
Transformer Low Side Volts (V)
Compressor Amps (A)
Motor Amps (A)