Chapter
3.
Installing
the
uninterruptible
power
supply
and
the
SAN
Volume
Controller
This
chapter
describes
the
steps
you
must
perform
to
install
the
SAN
Volume
Controller
and
the
uninterruptible
power
supply.
Attention:
Before
you
begin
the
installation,
ensure
that
the
customer
has
completed
the
planning
table
provided
in
the
IBM
TotalStorage
SAN
Volume
Controller:
Planning
Guide
for
the
hardware
that
you
are
about
to
install.
If
you
are
connecting
cables
to
switches
that
are
currently
in
use,
confirm
with
the
customer
that
it
is
safe
for
you
to
proceed.
Go
no
further
with
these
instructions
until
you
are
satisfied
that
all
the
information
is
correct
and
valid.
Related
tasks
There
are
several
steps
you
need
to
do
to
prepare
for
the
installation
of
the
uninterruptible
power
supply
and
the
SAN
Volume
Controller.
You
must
install
the
support
rails
in
the
rack
before
installing
the
uninterruptible
power
supply
(UPS)
5115
or
the
uninterruptible
power
supply
(UPS)
5125.
After
you
have
completed
the
preparation
procedures,
you
are
ready
to
install
the
uninterruptible
power
supply
(UPS)
5115
in
the
rack.
After
you
have
completed
the
preparation
procedures,
you
are
ready
to
install
the
uninterruptible
power
supply
(UPS)
5125
in
the
rack.
The
support
rails
should
be
installed
to
hold
the
SAN
Volume
Controller.
After
installing
the
support
rails,
you
are
ready
to
install
the
SAN
Volume
Controller
in
the
rack.
There
are
a
few
restrictions
you
should
be
aware
of
before
you
connect
the
SAN
Volume
Controller
node
to
the
uninterruptible
power
supply
(UPS)
5125.
Before
you
connect
the
SAN
Volume
Controller
to
the
SAN,
you
must
connect
the
Ethernet
and
fibre
channel
cables.
Once
the
SAN
Volume
Controller
is
installed,
you
can
verify
the
installation.
Preparing
for
installation
There
are
several
steps
you
need
to
do
to
prepare
for
the
installation
of
the
uninterruptible
power
supply
and
the
SAN
Volume
Controller.
Before
you
start
to
install
the
uninterruptible
power
supply
and
the
SAN
Volume
Controller,
ensure
that
you
have
everything
that
you
need,
including
the
customer
completed
planning
tables
and
charts
provided
in
the
IBM
TotalStorage
SAN
Volume
Controller:
Planning
Guide
.
These
tables
include
the
location
of
hardware,
cable
connection,
and
configuration
data
information
that
you
will
need
to
complete
the
installation
procedures.
©
Copyright
IBM
Corp.
2003,
2005
33
Summary of Contents for TotalStorage SAN Volume Controller
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 2 1 0 SC26 7541 04...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 2 1 0 SC26 7541 04...
Page 8: ...vi IBM TotalStorage SAN Volume Controller Installation Guide...
Page 10: ...viii IBM TotalStorage SAN Volume Controller Installation Guide...
Page 11: ...Tables 1 Uninterruptible power supply support guidelines 17 Copyright IBM Corp 2003 2005 ix...
Page 12: ...x IBM TotalStorage SAN Volume Controller Installation Guide...
Page 30: ...xxviii IBM TotalStorage SAN Volume Controller Installation Guide...
Page 44: ...14 IBM TotalStorage SAN Volume Controller Installation Guide...
Page 62: ...32 IBM TotalStorage SAN Volume Controller Installation Guide...
Page 102: ...72 IBM TotalStorage SAN Volume Controller Installation Guide...
Page 108: ...78 IBM TotalStorage SAN Volume Controller Installation Guide...
Page 114: ...84 IBM TotalStorage SAN Volume Controller Installation Guide...