2
1U fascia (power supply units)
7. Remove the cable management arm assembly from its packaging (
2
Installing an optional 5U SAS expansion enclosure
Before you install the optional 5U SAS expansion enclosure, review the following guidelines:
The expansion enclosure is supported on Storwize V7000 2076-724 and 2077-424 systems that have
Spectrum Virtualize 8.2.0 or later with the latest fix packs. If the system is not running that level of
software, do not connect it to a enclosure.
Safety notices and considerations: 2077-92F, 2077-A9F
Before you install, service, or move the expansion enclosure, always read and follow the safety notices
and guidelines.
Safety notices
Use the reference numbers in parentheses at the end of each notice (for example, D005) to find the
matching translated notice in .
DANGER: DANGER: Serious injury or death can occur if loaded lift tool falls over or if a heavy load
falls off the lift tool. Always completely lower the lift tool load plate and properly secure the load
on the lift tool before moving or using the lift tool to lift or move an object. (D010)
DANGER: Multiple power cords. The product might be equipped with multiple power cords. To
remove all hazardous voltages, disconnect all power cords. (L003)
DANGER:
Hazardous voltage present. Voltages present constitute a shock hazard, which can cause severe
injury or death. (L004)
DANGER:
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted
with metal, which might result in splattered metal, burns, or both. (L005)
Chapter 2. Installing the system hardware 23
Summary of Contents for Storwize V5100 MTM 2078-12F
Page 143: ......