![IBM SCM Manual Download Page 10](http://html.mh-extra.com/html/ibm/scm/scm_manual_607977010.webp)
c.
Label the SMP cables so they may be plugged back into the same slots.
d.
Grip the pull tab and pull in the direction indicated to remove the SMP cables.
9.
Remove all clock card cables
a.
Make note of the location from which each clock card cable is removed. They must be plugged
into the same location when reinstalled.
6
Power Systems: SCM
Summary of Contents for SCM
Page 1: ...Power Systems SCM IBM ...
Page 2: ......
Page 3: ...Power Systems SCM IBM ...
Page 4: ...ii Power Systems SCM ...
Page 22: ...18 Power Systems SCM ...
Page 52: ...48 Power Systems SCM ...
Page 53: ......
Page 54: ...IBM Printed in USA ...