Note:
Some pictures in the procedure from this step onward show the node on slide rails. This
should be ignored because the system has been removed from the rails and is positioned on the
lift tool.
14.
Remove Top Cover
Note:
The following steps apply only to the system node being serviced.
a.
Lift up the cover latch.
b.
Lift the cover off the system.
10
Power Systems: SCM
Summary of Contents for SCM
Page 1: ...Power Systems SCM IBM ...
Page 2: ......
Page 3: ...Power Systems SCM IBM ...
Page 4: ...ii Power Systems SCM ...
Page 22: ...18 Power Systems SCM ...
Page 52: ...48 Power Systems SCM ...
Page 53: ......
Page 54: ...IBM Printed in USA ...