6.
Reconnect the cables to the PCIe3 6-slot fanout module.
Preparing the EMX0 PCIe3 expansion drawer for operation after you
remove and replace a PCIe3 6-slot fanout module
To prepare the EMX0 PCIe3 expansion drawer for operation, complete the steps in this procedure.
Procedure
1.
Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2.
Put the cable management bracket in the operating position. See Figure 16 on page 16.
a.
Pull out the quarter-turn fasteners (B) and turn them to disengage them while moving the cable
management bracket (A) to its lower position.
b.
Turn the quarter-turn fasteners (B) to engage and lock the bracket into position.
Figure 15. Closing the release latches on the PCIe3 6-slot fanout module
PCIe3 6-slot fanout module
15
Summary of Contents for Power System PCIe3
Page 1: ...Power Systems PCIe3 6 slot fanout module for the EMX0 PCIe Gen3 I O expansion drawer IBM...
Page 2: ......
Page 3: ...Power Systems PCIe3 6 slot fanout module for the EMX0 PCIe Gen3 I O expansion drawer IBM...
Page 6: ...iv Power Systems PCIe3 6 slot fanout module for the EMX0 PCIe Gen3 I O expansion drawer...
Page 16: ...xiv Power Systems PCIe3 6 slot fanout module for the EMX0 PCIe Gen3 I O expansion drawer...
Page 40: ...24 Power Systems PCIe3 6 slot fanout module for the EMX0 PCIe Gen3 I O expansion drawer...
Page 52: ...36 Power Systems PCIe3 6 slot fanout module for the EMX0 PCIe Gen3 I O expansion drawer...
Page 64: ...48 Power Systems PCIe3 6 slot fanout module for the EMX0 PCIe Gen3 I O expansion drawer...
Page 65: ......
Page 66: ...IBM...