Figure 129. Replacing the air baffle in a stand-alone system
Preparing the 9009-41A, 9009-42A, or 9223-42H system for operation after removing
and replacing the control panel display cable
To prepare the system for operation after removing and replacing a control panel display cable, complete
the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover.
For a rack-mounted system, complete the following steps. Refer to Figure 130 on page 135.
a. Slide the cover (A) onto the system unit.
b. Close the release latch (B) by pushing it in the direction shown.
134 Power Systems: Power Systems: Control panel
Summary of Contents for Power System 9009-41A
Page 1: ...Power Systems Control panel for the 9009 41A 9009 42A or 9223 42H IBM ...
Page 4: ...iv ...
Page 14: ...xiv Power Systems Power Systems Control panel ...
Page 20: ...or or or 6 Power Systems Power Systems Control panel ...
Page 64: ...Figure 48 Locking the front door 50 Power Systems Power Systems Control panel ...
Page 68: ...or or or 54 Power Systems Power Systems Control panel ...
Page 115: ...or or or Control panel cables for the 9009 41A 9009 42A or 9223 42H 101 ...
Page 158: ...144 Power Systems Power Systems Control panel ...
Page 169: ......
Page 170: ...IBM ...