background image

• When possible, use one hand only to connect or disconnect signal cables.
• Never turn on any equipment when there is evidence of fire, water, or structural damage.
• Do not attempt to switch on power to the machine until all possible unsafe conditions are corrected.
• When performing a machine inspection: Assume that an electrical safety hazard is present. Perform

all continuity, grounding, and power checks specified during the subsystem installation procedures to

ensure that the machine meets safety requirements. Do not attempt to switch power to the machine

until all possible unsafe conditions are corrected. Before you open the device covers, unless instructed

otherwise in the installation and configuration procedures: Disconnect the attached AC power cords,

turn off the applicable circuit breakers located in the rack power distribution panel (PDP), and

disconnect any telecommunications systems, networks, and modems.

• Connect and disconnect cables as described in the following procedures when installing, moving, or

opening covers on this product or attached devices.
To Disconnect: 1) Turn off everything (unless instructed otherwise). 2) For AC power, remove the power

cords from the outlets. 3) For racks with a DC power distribution panel (PDP), turn off the circuit

breakers located in the PDP and remove the power from the Customer's DC power source. 4) Remove

the signal cables from the connectors. 5) Remove all cables from the devices.
To Connect: 1) Turn off everything (unless instructed otherwise). 2) Attach all cables to the devices. 3)

Attach the signal cables to the connectors. 4) For AC power, attach the power cords to the outlets. 5)

For racks with a DC power distribution panel (PDP), restore the power from the Customer's DC power

source and turn on the circuit breakers located in the PDP. 6) Turn on the devices.

 Sharp edges, corners and joints may be present in and around the system. Use

care when handling equipment to avoid cuts, scrapes and pinching. (D005)

(R001 part 1 of 2):

DANGER: Observe the following precautions when working on or around your IT rack system:
• Heavy equipment–personal injury or equipment damage might result if mishandled.
• Always lower the leveling pads on the rack cabinet.
• Always install stabilizer brackets on the rack cabinet if provided, unless the earthquake option is

to be installed.

• To avoid hazardous conditions due to uneven mechanical loading, always install the heaviest

devices in the bottom of the rack cabinet. Always install servers and optional devices starting

from the bottom of the rack cabinet.

• Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top

of rack-mounted devices. In addition, do not lean on rack mounted devices and do not use them

to stabilize your body position (for example, when working from a ladder).

• Stability hazard:

– The rack may tip over causing serious personal injury.
– Before extending the rack to the installation position, read the installation instructions.
– Do not put any load on the slide-rail mounted equipment mounted in the installation position.
– Do not leave the slide-rail mounted equipment in the installation position.

• Each rack cabinet might have more than one power cord.

– For AC powered racks, be sure to disconnect all power cords in the rack cabinet when directed

to disconnect power during servicing.

vi  Power Systems: Installing the IBM Power S1014 (9105-41B)

Summary of Contents for Power S1014

Page 1: ...Power Systems Installing the IBM Power S1014 9105 41B IBM GI11 0002 00...

Page 2: ...1110 and G229 9054 and the IBM Environmental Notices and User Guide Z125 5823 This edition applies to IBM Power Systems servers that contain the POWER10 processor and to all associated models Copyrig...

Page 3: ...server to the installation site 1 Completing inventory for your stand alone server 1 Cabling the server and setting up a console 2 Completing the server setup 9 Notices 13 Accessibility features for...

Page 4: ...iv...

Page 5: ...erordnung geeignet Laser safety information IBM servers can use I O cards or features that are fiber optic based and that utilize lasers or LEDs Laser compliance IBM servers may be installed inside or...

Page 6: ...power attach the power cords to the outlets 5 For racks with a DC power distribution panel PDP restore the power from the Customer s DC power source and turn on the circuit breakers located in the PDP...

Page 7: ...g or overcurrent protection To provide the correct power connection to a rack refer to the rating labels located on the equipment in the rack to determine the total power requirement of the supply cir...

Page 8: ...ned at more than 10 degrees When the rack cabinet is in the new location complete the following steps Lower the four leveling pads Install stabilizer brackets on the rack cabinet or in an earthquake e...

Page 9: ...sition read the installation instructions Do not put any load on the slide rail mounted equipment mounted in the installation position Do not leave the slide rail mounted equipment in the installation...

Page 10: ...power cords and power cables L003 L007 CAUTION A hot surface nearby L007 L008 CAUTION Hazardous moving parts nearby L008 L018 or CAUTION High levels of acoustical noise are or could be under certain c...

Page 11: ...exposure C026 CAUTION Data processing environments can contain equipment transmitting on system links with laser modules that operate at greater than Class 1 power levels For this reason never look i...

Page 12: ...tended platform Only raise load if properly centered on platform Do not place more than 200 lb 91 kg on edge of sliding platform shelf also considering the load s center of mass gravity CoG Do not cor...

Page 13: ...ing System GR 1089 CORE The following comments apply to the IBM servers that have been designated as conforming to NEBS Network Equipment Building System GR 1089 CORE The equipment is suitable for ins...

Page 14: ...xiv Power Systems Installing the IBM Power S1014 9105 41B...

Page 15: ...ates and fixes see the Hardware Management Console Support and downloads website https www14 software ibm com webapp set2 sas f hmcl home html Consider the following prerequisites before you install t...

Page 16: ...ntenance and control The eBMC also provides access to the system event log files SEL The eBMC is a specialized service processor that monitors the physical state of the system by using sensors A syste...

Page 17: ...page 6 Keyboard video and mouse KVM Linux or VIOS Yes Monitor and USB cables equipped with KVM Cabling the server with keyboard video and mouse on page 5 Cabling the server with an ASCII terminal If...

Page 18: ...e power supplies are flashing If none of the indicators are flashing check the power cord connections 3 Wait for the green light on the control panel to start flashing 4 Ensure that your ASCII termina...

Page 19: ...com support knowledgecenter POWER9 p10hai p10hai_netconhmc htm Notes You can also have multiple systems that are attached to a switch that is then connected to the HMC For instructions see HMC networ...

Page 20: ...M i Access ACS Getting Started https www ibm com support pages ibm i access acs getting started 3 0 Note It is recommended that you log onto the PC as the local administrator This ensures that you hav...

Page 21: ...e server set to a manual IPL push the white power button to power on the server Note During the IPL the system displays C6004031 on the control panel which indicates that the system is searching for a...

Page 22: ...the information to be displayed 8 To set a static IP address for the Operations Console complete the following steps a Sign on with QSECOFR The default password is QSECOFR and it is case sensitive b A...

Page 23: ...the following steps i Connect the system power cords from the server and I O drawers to the PDU with an IEC 320 type receptacle ii Attach the PDU input power cord and plug it into the power source ii...

Page 24: ...date the time of day on the managed system by using the Advanced System Management Interface ASMI To access ASMI by using the HMC complete the following steps a In the contents area select the managed...

Page 25: ...edgecenter POWER10 p10hdx p10hdx_installlinux htm Install the VIOS operating system For instructions see Installing VIOS https www ibm com support knowledgecenter POWER10 p10hb1 p10hb1_vios_install ht...

Page 26: ...the operating system Install the AIX operating system For instructions see Installing AIX http www ibm com support knowledgecenter POWER10 p10hdx p10hdx_installaix htm Install the Linux operating sys...

Page 27: ...oduct s and or the program s described in this publication at any time without notice Any references in this information to non IBM websites are provided for convenience only and do not in any manner...

Page 28: ...st users who have a disability such as restricted mobility or limited vision to use information technology content successfully Overview The IBM Power servers include the following major accessibility...

Page 29: ...deployed for this Software Offering provide you as the customer the ability to collect personally identifiable information from end users via cookies and other technologies you should seek your own le...

Page 30: ...nforderungen der EU Richtlinie 2014 30 EU zur Angleichung der Rechtsvorschriften ber die elektromagnetische Vertr glichkeit in den EU Mitgliedsstaatenund h lt die Grenzwerte der EN 55022 EN 55032 Klas...

Page 31: ...ormationen Das Ger t erf llt die Schutzanforderungen nach EN 55024 und EN 55022 EN 55032 Klasse A Japan Electronics and Information Technology Industries Association JEITA Notice This statement applie...

Page 32: ...ssion FCC Notice This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable pr...

Page 33: ...to reduce electromagnetic emissions to prevent interference to the reception of radio and television broadcasts Class B Notices The following Class B statements apply to features designated as electro...

Page 34: ...ormit tszeichen CE zu f hren Verantwortlich f r die Einhaltung der EMV Vorschriften ist der Hersteller International Business Machines Corp New Orchard Road Armonk New York 10504 Tel 914 499 1900 Der...

Page 35: ...by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit differe...

Page 36: ...ay these publications or any portion thereof outside your enterprise without the express consent of IBM Rights Except as expressly granted in this permission no other permissions licenses or rights ar...

Page 37: ......

Page 38: ...IBM Part Number 03KG354 GI11 0002 00 1P P N 03KG354...

Reviews: