9.
Secure both rails to the rear EIA support flanges using four M5 x 16mm screws (
C
).
Removing the power supply shipping bracket and the shipping covers
If you haven't already done so, remove the front and rear shipping covers and the rear shipping bracket
before you remove the processor assembly and install the system chassis.
1.
Remove the screws that attach the front shipping cover (
A
) to the system chassis, and remove the
front shipping cover.
2.
At the rear of the system, remove the power supply retaining bracket (
B
) and then remove the rear
shipping cover (
C
) from the chassis.
Figure 3. Rear of rack rail alignment and nut clip locations
Installing the server into a rack
5
Summary of Contents for Power 750 Express 8408-E8D
Page 2: ......
Page 6: ...iv Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...
Page 30: ...18 Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...
Page 42: ...30 Power Systems Installing the IBM Power 750 8408 E8D and IBM PowerLinux 7R4 8248 L4T...
Page 65: ......
Page 66: ...Part Number 00L5075 Printed in USA GI11 9890 01 1P P N 00L5075...