v
Back
up
all
important
data
before
you
make
changes
to
disk
drives.
v
Have
a
small
flat-blade
and
a
small
Phillips
head
screwdriver
available.
v
You
do
not
have
to
turn
off
the
server
to
install
or
replace
hot-swap
power
supplies,
hot-swap
fans,
or
hot-plug
Universal
Serial
Bus
(USB)
devices.
However,
you
must
turn
off
the
server
before
performing
any
steps
that
involve
removing
or
installing
adapter
cables.
v
Blue
on
a
component
indicates
touch
points,
where
you
can
grip
the
component
to
remove
it
from
or
install
it
in
the
server,
open
or
close
a
latch,
and
so
on.
v
Orange
on
a
component
or
an
orange
label
on
or
near
a
component
indicates
that
the
component
can
be
hot-swapped,
which
means
that
if
the
server
and
operating
system
support
hot-swap
capability,
you
can
remove
or
install
the
component
while
the
server
is
running.
(Orange
can
also
indicate
touch
points
on
hot-swap
components.)
See
the
instructions
for
removing
or
installing
a
specific
hot-swap
component
for
any
additional
procedures
that
you
might
have
to
perform
before
you
remove
or
install
the
component.
v
For
a
list
of
supported
options
for
the
server,
see
http://www.ibm.com/servers/
eserver/serverproven/compat/us/.
System
reliability
guidelines
To
help
ensure
proper
system
cooling
and
system
reliability,
make
sure
that
the
following
requirements
are
met:
v
Each
of
the
drive
bays
has
a
drive
or
a
filler
panel
and
electromagnetic
compatibility
(EMC)
shield
installed
in
it.
v
If
the
server
has
redundant
power,
each
of
the
power-supply
bays
has
a
power
supply
installed
in
it.
v
There
is
adequate
space
around
the
server
to
allow
the
server
cooling
system
to
work
properly.
Leave
approximately
50
mm
(2.0
in.)
of
open
space
around
the
front
and
rear
of
the
server.
Do
not
place
objects
in
front
of
the
fans.
For
proper
cooling
and
airflow,
replace
the
server
cover
before
turning
on
the
server.
v
You
have
followed
the
cabling
instructions
that
come
with
optional
adapters.
v
You
have
replaced
a
failed
fan
within
48
hours.
v
You
have
replaced
a
hot-swap
drive
within
2
minutes
of
removal.
v
You
do
not
operate
the
server
without
the
air
baffle
installed.
Operating
the
server
without
the
air
baffle
might
cause
the
microprocessor
to
overheat.
v
Microprocessor
socket
2
always
contains
either
a
microprocessor
baffle
or
a
microprocessor
and
heat
sink.
Working
inside
the
server
with
the
power
on
Attention:
Static
electricity
that
is
released
to
internal
server
components
when
the
server
is
powered-on
might
cause
the
server
to
halt,
which
could
result
in
the
loss
of
data.
To
avoid
this
potential
problem,
always
use
an
electrostatic-discharge
wrist
strap
or
other
grounding
system
when
working
inside
the
server
with
the
power
on.
The
server
supports
hot-plug,
hot-add,
and
hot-swap
devices
and
is
designed
to
operate
safely
while
it
is
turned
on
and
the
server
cover
is
removed.
Follow
these
guidelines
when
you
work
inside
a
server
that
is
turned
on:
v
Avoid
wearing
loose-fitting
clothing
on
your
forearms.
Button
long-sleeved
shirts
before
working
inside
the
server;
do
not
wear
cuff
links
while
you
are
working
inside
the
server.
v
Do
not
allow
your
necktie
or
scarf
to
hang
inside
the
server.
24
IBM
System
x3550
Type
7978:
User’s
Guide
Summary of Contents for 79788BU
Page 1: ...IBM System x3550 Type 7978 User s Guide...
Page 2: ......
Page 3: ...IBM System x3550 Type 7978 User s Guide...
Page 30: ...16 IBM System x3550 Type 7978 User s Guide...
Page 62: ...48 IBM System x3550 Type 7978 User s Guide...
Page 100: ...86 IBM System x3550 Type 7978 User s Guide...
Page 101: ......
Page 102: ...Part Number 42C4977 Printed in USA 1P P N 42C4977...