IBML
Installation Instructions
3. When CDF VERIFY COMPLETED is dis-
played, press F1.
10.1.6 Run the Diagnostics
1. Enter ODG, press Enter.
2. Enter 3 (IOCB), press Enter.
•
If NO ERROR FOUND is displayed,
press F1.
•
Otherwise, see the
MIP, Chapter 1.
10.1.7 Power OFF
Note
Remove all electrical power from the
machine and associated machines before the
hardware installation.
1. From the control panel, press the Power
OFF key.
2. Open the front system cover, then switch
OFF CB1.
Follow flow chart on page 3 for 2 CE/FE activity.
3745
PN 17G5534
EC C38405
EC C38405A
EC D55799
EC D55883
EC E27926
FFBM
7 of 22
06APR93
17JUN93
16SEP94
11MAY95
14MAR97
7