IBML
Installation Instructions
10.5.2 PSTY1B installation
1. Install the PSTY1B support a s m (PN
71F9950)
1
and secure it at the bottom
and at the top left with 3 screws provided
in the bag attached to it.
Do not tighten the screws.
2. Install the PSTY1B (PN 26F1733)
2
with
3 screws (PN 2665528) provided in the
bag attached to the support bracket.
3. Tighten the bottom screws of the power
supply bracket.
Feed the PSTY1B power cable to the
front of the machine.
4. Loosen the screw securing the bracket
3
that secures the air filter and install
the air filter (PN 58X9295) under the CCU
enclosure.
Note the arrow direction for the air flow.
Tighten the screw.
5. Connect the FDS ground cable
4
to the
frame. Secure it with the screws saved
in Step 10.2.1.
6. Connect the FDS cables
5
to the
PSTY1B with screws (PN 61F4511) pro-
vided in a bag attached to the power
supply.
Connect the cables on TB1/TB2 first.
7. Connect the power control bus cable to
the connector J2 of the power supply
6
.
8. Locate the Power On Reset cable (PN
61F4448) connected in the SACL
01B-A1Z2-D. Route the cable to PSTY1B
and connect it to connector J1
7
.
9. On PSTY1B, check that the switch 1 is
set to A (CCUA)
8
.
3745
PN 17G5534
EC C38405
EC C38405A
EC D55799
EC D55883
EC E27926
FFBM
14 of 22
06APR93
17JUN93
16SEP94
11MAY95
14MAR97
14