Important: Before you unpack, move, install, or service the 2077-92G, 2077-A9G expansion enclosure
and its parts, always complete the following tasks:
• Read and follow the safety notices and instructions, as described in “Safety notices and considerations”
• Read and follow the guidelines that are described in “Weight considerations: 5U expansion enclosure”
• Ensure that a suitably rated mechanical lift is available to support the weight of the expansion enclosure
when it is inserted into the rack for installation.
About this task
The 2077-92G, 2077-A9G expansion enclosure and most parts are shipped together in one large box. A
tray on top of the enclosure contains the front fascia (1U and 4U pieces), the cable management arm
(CMA), and the slide rail kit. Figure 12 on page 16 shows how the enclosure is packaged for shipment.
Figure 12. Tray containing expansion enclosure parts
1
Slide rail kit
2
Cable management arm
3
Fascia
Note: Drives are not included in installation package for the enclosure; they are provided in a separate
package.
Procedure
1. Remove the cardboard tray that contains the slide rails, cable management arm, and fascia from
cardboard box in which the expansion enclosure was shipped.
2. Remove the foam end pieces from the top of the 2077-92G, 2077-A9G expansion enclosure.
3. Cut the corners of the shipping box and fold them down to uncover the sides and faces of the
expansion enclosure, as shown in Figure 13 on page 17.
16 FlashSystem 5100 : Quick Installation Guide for MTM 2078-4F4, 2078-4H4, 2078-12G, 2078-AFG,
2078-24G, 2078-A9G, 2078-92G, and 2078-UHB
Summary of Contents for 2078-4F4
Page 129: ......
Page 130: ...IBM ...