background image

IBM Taiwan Contact Information:

United States Federal Communications Commission (FCC) Notice

This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These

limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial

environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the

instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to

cause harmful interference, in which case the user will be required to correct the interference at his own expense.
Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. IBM is not responsible for any

radio or television interference caused by using other than recommended cables and connectors, or by unauthorized changes or

modifications to this equipment. Unauthorized changes or modifications could void the user's authority to operate the equipment.
This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions:
(1) this device might not cause harmful interference, and (2) this device must accept any interference received, including interference that

might cause undesired operation.

Responsible Party:

International Business Machines Corporation

New Orchard Road

Armonk, NY 10504

Contact for FCC compliance information only: [email protected]

This edition applies to version 8, release 4, modification 0, and to all subsequent modifications until otherwise indicated in new editions.

©

 Copyright International Business Machines Corporation 2019, 2020.

US Government Users Restricted Rights – Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.

(1P) P/N: 03GU853

17

Summary of Contents for 2076-724

Page 1: ...ms are available Philips screw driver Box knife Flat blade screw driver optional Three Ethernet cables The control enclosure and the following related parts are included in one box The enclosed invent...

Page 2: ...a power supply unit on page 3 10 Record the last 6 digits of the serial number on the back of each PSU then set the power supplies aside Item Left PSU Right PSU Serial Number 11 Remove the upper and...

Page 3: ...t To reduce weight during the installation procedure you must remove and replace the power supply units PSUs in a control enclosure When the system is running the redundant PSUs operate in parallel on...

Page 4: ...lifting platform or other nearby surface to support the node canister as it is extracted from the control enclosure 4 Hold the node canister by its sides so that it is level and its weight is balanced...

Page 5: ...nclosure 2 To add a second expansion enclosure chain to the control enclosure complete the following steps a Connect SAS port 3 of the top node canister in the control enclosure to SAS port 1 of the l...

Page 6: ...system 32 Gbps FC 4 0 3 Supports simultaneous SCSI and NVMeFC connections on the same port 25 Gbps Ethernet iWARP 2 0 3 Supports iSCSI or iSER host attachment 25 Gbps Ethernet RoCE 2 0 3 12 Gbps SAS...

Page 7: ...erwise continue to Setting up the system on page 7 Setting up the system Each node canister in the control enclosure has a 1 Gbps Ethernet technician port Before you initiate a new system you must con...

Page 8: ...ort Release ESR 78 2 0 Microsoft Edge 85 0 Google Chrome 85 0 JavaScript Cookies Scripts allowed to disable or replace context menus Mozilla Firefox only In addition review the following consideration...

Page 9: ...ernet cable from Ethernet port 2 on the node to canister your Ethernet network Port 2 can be used for the management GUI and for iSCSI host attachment Ethernet ports 3 and 4 are for iSCSI attachment o...

Page 10: ...net mask Gateway VLAN ID FlashSystem 7200 Fibre Channel connections Each node canister supports 4 port 32 Gbps Fibre Channel FC adapters or 4 port 16 Gbps FC adapters Install the FC networking adapter...

Page 11: ...to the following guidelines Then record the FC port connections in the following table Install the first FC adapter in adapter slot 1 Install the second FC adapter if applicable in adapter slot 2 Ada...

Page 12: ...c Click the documentation link Environmental notices This information contains all the required environmental notices for IBM Systems products in English and other languages The IBM Systems Environme...

Page 13: ...atents You can send license inquiries in writing to IBM Director of Licensing IBM Corporation North Castle Drive Armonk NY 10504 1785 U S A For license inquiries regarding double byte character set DB...

Page 14: ...bute these sample programs in any form without payment to IBM for the purposes of developing using marketing or distributing application programs conforming to the application programming interface fo...

Page 15: ...ohne Zustimmung von IBM ver ndert bzw wenn Erweiterungskomponenten von Fremdherstellern ohne Empfehlung von IBM gesteckt eingebaut werden EN 55032 Klasse A Ger te m ssen mit folgendem Warnhinweis vers...

Page 16: ...atement applies to products greater than 20 A per phase three phase Japan Voluntary Control Council for Interference VCCI Notice Korea Notice People s Republic of China Notice Russia Notice Taiwan Not...

Page 17: ...is not responsible for any radio or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications to this equipment Unauthorized cha...

Reviews: