OPERATING INSTRUCTIONS

16

V-10 TOUCH SCREEN BOILER CONTROLLER

Heat-apportioning can be altered in the Installer Settings input section. For 

instance if Baseboards (set up with Outdoor Reset as Load 3) are not providing 

the desired heat, the on-time of the baseboards can be increased by increasing 

the Priority value relative to the other declared channels (e.g. moving the Load 3 

preset value from 43 to 50 or reducing another load’s value). Temperature targets 

for the under-served load could also be raised in this example. The basic function 

is that the difference between settings equals the run time (in minutes, for the 

initial cycle) of the higher load setting before switch-over to the simultaneously 

calling load, e.g. DHW with priority set to 80 will run for approx. 35 min. before 

switching to a clashing load set with priority 45. Following such initial cycle, the 

competing loads will switch back and forth after further 10 min. intervals pending 

satisfaction of one or both loads.
To cause repeated unequal run times (for example, constant 35 vs 5 min. runs) it 

is necessary to integrate an external load removing relay or timer on one of the 

heat calls (contact the Factory for details). Do not set each load to the top value, 

and it is generally better to avoid equal ratings. 

NOTE:

 the priority scale values 

do not need to add up to 100 – they are relative only to each other.

1.7.2 Load Combining

The controller allows two loads of compatible temperature settings to be run 

together.
Access to enable the feature and enter the required settings is done by selecting 

Load Combining

 on the 

Installer Settings

 screen.

There are 5 parameter settings associated with Load Combining:

PARAMETER

DEFAULT

MINIMUM

MAXIMUM

Primary Load

Disabled

Load1

Load 4

Secondary Load

Disabled

Load1

Load 4

Initial Delay

5

2

15

Off Delay

5

2

15

Retry Delay

10

5

60

Maximum Throttle %

75

50

90

1. 

Primary Load:

 Set to the load that will control the boiler operation while 

Load Combining is active. This load must have a higher initial priority 

than the 

Secondary Load

 and should have a higher water temperature 

requirement. The Load Combining feature is disabled when this parameter is 

set to 

Disabled

.

2. 

Secondary Load:

 Set to the load that will be serviced simultaneously, in 

combination with the Primary Load, if the conditions for Load Combining are 

met. Load Combining conditions are met;

• 

if the supply temperature requirements for the Primary Load are being met,

• 

if the supply temperature is within the temperature range requirements of 

the Secondary Load and,

• 

if the boiler has the capacity to service the Secondary Load as determined 

by the Maximum Throttle % setting.

 

The Load Combining feature is disabled when this parameter is set to 

Disabled

.

Summary of Contents for V-10

Page 1: ...OPERATING INSTRUCTIONS www ibcboiler com V 10 TOUCH SCREEN BOILER CONTROLLER This Manual is also available in French contact IBC or visit our web site www ibcboiler com...

Page 2: ......

Page 3: ...5 5 2 SYSTEM SETTINGS 10 1 5 6 DIAGNOSTICS 10 1 6 SEQUENCE OF OPERATION 12 1 6 1 STANDBY 13 1 6 2 PURGING 13 1 6 3 IGNITION 13 1 6 4 HEATING 14 1 6 5 CIRCULATING 14 1 6 6 ERROR MODE 15 1 7 OTHER OPERA...

Page 4: ......

Page 5: ...card or USB stick Superior warning messages while setting up the control Advanced Error messages with visual display on the Home Screen Internet LAN connectivity BACnet with activation CONTROL When th...

Page 6: ...rea consisting of the screen title bar at the top and a boarder surrounding the active area At the bottom of the display there is space reserved for the boiler status bar Prior to any interaction with...

Page 7: ...ry buttons are used to set the load type Radio buttons are used to select a setting from a list of options and can be used in conjunction with entry boxes A check box is used to select whether a speci...

Page 8: ...viewable will scroll with the side bar You can also tap the arrows at either end of the Slide Bar to move the bar up or down 1 3 2 6 COMMON BUTTON ICONS Save will save the displayed settings and retu...

Page 9: ...settings The User Setup selection provides a relatively simple interface allowing for the adjustment of settings relevant to the user while Installer Setup gives field access to the full functionalit...

Page 10: ...2 Express Setup Express Setup is a quick and simple method to set all the necessary parameters for most single boiler installations Express Setup sets parameters to default values including all the a...

Page 11: ...s of a load or to add settings for a programmed load Outdoor design temperature can be adjusted in the Installer Menu 1 5 3 Load Status Touching one of the Load 1 to 4 buttons will bring up a status d...

Page 12: ...previously known as Load Pairing feature Refer to section 1 7 2 System Settings leads to a menu screen where the Site Settings Network Settings Security Licensing and Backup Restore selections are av...

Page 13: ...pump to operate for a period of time to transfer heat that is stored in the boiler s heat exchanger into the hot water tank This feature is adjustable in seconds from 0 to 900 15 min If the load has...

Page 14: ...e time manual pump purge and the variable speed output control settings The Network Settings screen is used to assign the boiler its ID address and network configuration to support multi boiler operat...

Page 15: ...sors status screen displays the current active value for each of the pressure sensors the water Flow Rate VS Load Duty Cycle and the Altitude If a sensor is not connected to the controller it will dis...

Page 16: ...history is not cleared Reset Factory Defaults will take approximately 2 minutes to complete Over time the touch pad calibration can drift slightly resulting in the touch locations being out of line wi...

Page 17: ...iler target water temperature 1 2 the Supply Differential The cut off temperature levels are specific for each load for space heating they are determined using the preset target plus 1 2 of the Supply...

Page 18: ...ater temperature is 1 2 of the supply differential below setpoint temperature The boiler can also enter the Circulating mode during transition from any high temperature load e g DHW at 180 F to the co...

Page 19: ...the boiler s operation when more than one load has been defined Typically loads declared as DHW receive significant but not absolute priority Multiple heating loads with varying temperature targets ar...

Page 20: ...id equal ratings NOTE the priority scale values do not need to add up to 100 they are relative only to each other 1 7 2 Load Combining The controller allows two loads of compatible temperature setting...

Page 21: ...ottle has no effect once the loads have been combined 1 7 2 1 CONSIDERATIONS FOR COMBINING LOADS The Primary and Secondary loads must have compatible temperature parameter settings or the Secondary lo...

Page 22: ...exes the boiler supply temperature according to characterized heating curves that are automatically called up through the load declaration process Curves are provided for each of the radiation termina...

Page 23: ...baseboards sink very little heat when operated below 90 F 32 C application of a full reset curve e g 160 F 71 C right down to a 70 F 21 C room target would cause boiler cycling in light to moderate h...

Page 24: ...upied mode the DHW load is turned off while a Reset Heating load will have it s circulating water temperature lowered by reducing the Indoor Setpoint to 50 F 10 C Set Point controlled loads are not ad...

Page 25: ...oads with the same priority logic and sequencing 1 7 9 Alarm Contacts The controller provides a relay dry contact connection to indicate the boiler s alarm state externally This can be used for exampl...

Page 26: ...work the JA02 must be removed on the middle boiler only Please contact IBC if any additional information is required 1 7 11 Internet Networking Internet Protocol IP networking based features are suppo...

Page 27: ...outer connecting the boiler s local area network to the Internet have its port forwarding settings configured to forward port 80 to the boiler s local IP address In this case the remote browser will a...

Page 28: ...OPERATING INSTRUCTIONS 24 V 10 TOUCH SCREEN BOILER CONTROLLER DIAGRAMS ELECTRICAL WIRING DIAGRAM 2 0 2 1...

Page 29: ...rm 2 TB2 7 Therm 3 TB2 8 or Therm 4 TB2 9 depending on the load it is intended to control Power stealing thermostats take a small amount of current from the 24 VAC to operate their internal electronic...

Page 30: ...e white black black Vent High Limit Switch Upper Vessel High Limit Switch Water High Limit Switch white yellow black yellow red white red white white white white white black yellow yellow black black...

Page 31: ...PERATING INSTRUCTIONS V 10 TOUCH SCREEN BOILER CONTROLLER CONTROLLER BOARD LAYOUT 2 3 NOTE See Instruction Sheet for instructions on installing a V 10 Touch Screen Boiler Controller Re Order Part 500...

Page 32: ...OPERATING INSTRUCTIONS 28 V 10 TOUCH SCREEN BOILER CONTROLLER SEQUENCE OF OPERATION 2 4...

Page 33: ...NOTES...

Page 34: ...NOTES...