Overrides

 screen allows the override programming for each load to be 

enabled or disabled and by touching the 

Edit

 button the override temperatures 

with corresponding start and end times can be set for each load by day of the 

week. There are two override programs for each day of the week. 

(Refer to 

section: 1.7.5)

The 

Backlight Settings

 screen provides a slide bar to set the screen backlight 

level (brightness) and a 

Dim Time

 setting to control the length of time, with no touch 

screen interaction, the controller waits before dimming the screen to save power.

1.5.5 Installer Settings

The 

Installer Settings

 screen gives access to all configurable settings for the 

advanced installer.
There is an Entry Button for each of the 4 available loads used to assign the 

load types. Once a type is assigned all the load’s parameters can be edited 

independently. Setting the load type to 

Off

 means that load is disabled and will 

not be used.
The 

Multi-Boiler, Load Combining

 and 

System Settings

 menu buttons 

complete the selections available on the 

Installer Settings

 screen. 

• 

Multi-Boiler

 provides access to settings required for the boiler to operate as 

part of a multi-boiler system. 

(Refer to section: 1.7.10)

• 

Load Combining

 provides access to settings for required to enable the 

boiler’s Load Combining (previously known as Load Pairing) feature. 

(Refer to 

section: 1.7.2 )

• 

System Settings

 leads to a menu screen where the 

Site Settings, Network 

Settings, Security, Licensing

 and 

Backup & Restore

 selections are 

available.

1.5.5.1 LOAD SETTINGS

Most load settings available to adjust are self-explanatory to the experienced 

installer but listed below are ones that may be new to some installers:

Boiler Pump

 – This feature is available for all load types and allows the installer 

to have the Boiler Pump (primary loop pump) off while this load is running. The 

load pump must be piped in such a way (series piping) as to ensure adequate 

flow through the boiler without needing the Boiler Pump to provide flow through 

the heat exchanger. When you set the Boiler Pump to 

Off

 a warning message will 

appear as a reminder. If the load is a radiant floor then it is strongly recommended 

to use primary/secondary piping and leave the Boiler Pump set 

On

.

Ramp Speed

 – Ramp Speed allows the installer to adjust how fast the boiler 

tries to raise the water temperature flowing though the heat emitters. With a fin 

tube baseboard radiator you may want the water temperature to rise quickly to 

provide heat as quickly as possible. This type of heat emitter has very little mass 

so it can heat up quickly and when the call for heat is removed, cools down 

quickly. A radiant floor, on the other hand, has significant mass therefore takes a 

long time to heat up. When the call for heat is removed, the floor is still warm and 

will continue to add heat to the space for a significant period of time.

Summary of Contents for V-10

Page 1: ...OPERATING INSTRUCTIONS www ibcboiler com V 10 TOUCH SCREEN BOILER CONTROLLER This Manual is also available in French contact IBC or visit our web site www ibcboiler com...

Page 2: ......

Page 3: ...5 5 2 SYSTEM SETTINGS 10 1 5 6 DIAGNOSTICS 10 1 6 SEQUENCE OF OPERATION 12 1 6 1 STANDBY 13 1 6 2 PURGING 13 1 6 3 IGNITION 13 1 6 4 HEATING 14 1 6 5 CIRCULATING 14 1 6 6 ERROR MODE 15 1 7 OTHER OPERA...

Page 4: ......

Page 5: ...card or USB stick Superior warning messages while setting up the control Advanced Error messages with visual display on the Home Screen Internet LAN connectivity BACnet with activation CONTROL When th...

Page 6: ...rea consisting of the screen title bar at the top and a boarder surrounding the active area At the bottom of the display there is space reserved for the boiler status bar Prior to any interaction with...

Page 7: ...ry buttons are used to set the load type Radio buttons are used to select a setting from a list of options and can be used in conjunction with entry boxes A check box is used to select whether a speci...

Page 8: ...viewable will scroll with the side bar You can also tap the arrows at either end of the Slide Bar to move the bar up or down 1 3 2 6 COMMON BUTTON ICONS Save will save the displayed settings and retu...

Page 9: ...settings The User Setup selection provides a relatively simple interface allowing for the adjustment of settings relevant to the user while Installer Setup gives field access to the full functionalit...

Page 10: ...2 Express Setup Express Setup is a quick and simple method to set all the necessary parameters for most single boiler installations Express Setup sets parameters to default values including all the a...

Page 11: ...s of a load or to add settings for a programmed load Outdoor design temperature can be adjusted in the Installer Menu 1 5 3 Load Status Touching one of the Load 1 to 4 buttons will bring up a status d...

Page 12: ...previously known as Load Pairing feature Refer to section 1 7 2 System Settings leads to a menu screen where the Site Settings Network Settings Security Licensing and Backup Restore selections are av...

Page 13: ...pump to operate for a period of time to transfer heat that is stored in the boiler s heat exchanger into the hot water tank This feature is adjustable in seconds from 0 to 900 15 min If the load has...

Page 14: ...e time manual pump purge and the variable speed output control settings The Network Settings screen is used to assign the boiler its ID address and network configuration to support multi boiler operat...

Page 15: ...sors status screen displays the current active value for each of the pressure sensors the water Flow Rate VS Load Duty Cycle and the Altitude If a sensor is not connected to the controller it will dis...

Page 16: ...history is not cleared Reset Factory Defaults will take approximately 2 minutes to complete Over time the touch pad calibration can drift slightly resulting in the touch locations being out of line wi...

Page 17: ...iler target water temperature 1 2 the Supply Differential The cut off temperature levels are specific for each load for space heating they are determined using the preset target plus 1 2 of the Supply...

Page 18: ...ater temperature is 1 2 of the supply differential below setpoint temperature The boiler can also enter the Circulating mode during transition from any high temperature load e g DHW at 180 F to the co...

Page 19: ...the boiler s operation when more than one load has been defined Typically loads declared as DHW receive significant but not absolute priority Multiple heating loads with varying temperature targets ar...

Page 20: ...id equal ratings NOTE the priority scale values do not need to add up to 100 they are relative only to each other 1 7 2 Load Combining The controller allows two loads of compatible temperature setting...

Page 21: ...ottle has no effect once the loads have been combined 1 7 2 1 CONSIDERATIONS FOR COMBINING LOADS The Primary and Secondary loads must have compatible temperature parameter settings or the Secondary lo...

Page 22: ...exes the boiler supply temperature according to characterized heating curves that are automatically called up through the load declaration process Curves are provided for each of the radiation termina...

Page 23: ...baseboards sink very little heat when operated below 90 F 32 C application of a full reset curve e g 160 F 71 C right down to a 70 F 21 C room target would cause boiler cycling in light to moderate h...

Page 24: ...upied mode the DHW load is turned off while a Reset Heating load will have it s circulating water temperature lowered by reducing the Indoor Setpoint to 50 F 10 C Set Point controlled loads are not ad...

Page 25: ...oads with the same priority logic and sequencing 1 7 9 Alarm Contacts The controller provides a relay dry contact connection to indicate the boiler s alarm state externally This can be used for exampl...

Page 26: ...work the JA02 must be removed on the middle boiler only Please contact IBC if any additional information is required 1 7 11 Internet Networking Internet Protocol IP networking based features are suppo...

Page 27: ...outer connecting the boiler s local area network to the Internet have its port forwarding settings configured to forward port 80 to the boiler s local IP address In this case the remote browser will a...

Page 28: ...OPERATING INSTRUCTIONS 24 V 10 TOUCH SCREEN BOILER CONTROLLER DIAGRAMS ELECTRICAL WIRING DIAGRAM 2 0 2 1...

Page 29: ...rm 2 TB2 7 Therm 3 TB2 8 or Therm 4 TB2 9 depending on the load it is intended to control Power stealing thermostats take a small amount of current from the 24 VAC to operate their internal electronic...

Page 30: ...e white black black Vent High Limit Switch Upper Vessel High Limit Switch Water High Limit Switch white yellow black yellow red white red white white white white white black yellow yellow black black...

Page 31: ...PERATING INSTRUCTIONS V 10 TOUCH SCREEN BOILER CONTROLLER CONTROLLER BOARD LAYOUT 2 3 NOTE See Instruction Sheet for instructions on installing a V 10 Touch Screen Boiler Controller Re Order Part 500...

Page 32: ...OPERATING INSTRUCTIONS 28 V 10 TOUCH SCREEN BOILER CONTROLLER SEQUENCE OF OPERATION 2 4...

Page 33: ...NOTES...

Page 34: ...NOTES...

Page 35: ...REVISION HISTORY R1 JULY 2014 Initial release R2 JULY 2015 Address update...

Page 36: ...IBC Technologies Inc 8015 North Fraser Way Burnaby BC Canada V5J 5M8 Tel 604 877 0277 Fax 604 877 0295 www ibcboiler com 120 198 R2 July 2015 IBC Technologies Inc 2015...

Reviews: