background image

 

16 

 
ESD GROUNDING 
 

HARDWARE KIT QS-HWR 014 and QS-HWR 122

 

 

Step 1   Note: do not use power tools for this installation 

For ESD worksurfaces and instrument shelves to dissipate static electricity they require the connection of a 
ground cord to an earth ground. IAC install grounding studs on each rear corner of all ESD worksurfaces and 
instrument shelves. Thread the 1/4-20 coupler nut onto one of these ground studs and tighten it being careful not 
to over tighten. Over tightening this coupler nut can cause damage to the connection between the ground stud 
and the laminate. Place the eyelet of the ground cord (or cords if you are also grounding an instrument shelf to 
the same ground stud) over the 1/4-20 x 1/2" bolt and thread the bolt into the coupler nut. The alligator clip must 
attach to an earth ground. 

 

        

 

 
ESD Laminate Testing: 

Although IAC conducts connectivity and surface resistance tests at the factory on all ESD worksurfaces and 
instrument shelves, IAC recommends that customers conduct their own tests on all ESD worksurfaces and 
instrument shelves to ensure that the ground cord installation has been completed correctly and that the ESD 
material is working properly. 

 

Cleaning ESD Materials:

 

ESD laminates are designed to resist abrasion, scuffing, scorching, and most solvents. Intense exposure to 
any of these conditions can damage the ESD properties of the laminate and will require the replacement of 
the worksurface or instrument shelf. ESD laminate worksurfaces and instrument shelves are cleaned much 
the same as non ESD laminated surfaces with a damp cloth and light soapy cleanser. A mild chemical 
cleaner can also be used as long as the laminate is not exposed to the chemical for long periods of time. 
Stains can be removed with a two minute exposure to a 5% hypo chloride bleach solution immediately 
followed by a light soapy cleanser.  
 

ESD Ground Precautions: 

1) 

Connect each workbench worksurface individually to the earth ground. 

2) 

The green wire in a standard wall duplex can be used if it has been absolutely determined that it is 
attached to an earth ground. 

3) 

Do not use power tools to install grounding hardware and components. 

4) 

If benches are relocated IAC recommends the ground cords connections be re-tested. 

5) 

Never use abrasive pads or cleansers to clean ESD surfaces. 

6) 

Never wax ESD surfaces and avoid cleaners with wax-based properties. 

7) 

Test ESD worksurfaces and instrument shelves frequently to ensure it is working properly. 

 

Summary of Contents for Quick Ship WORKMASTER

Page 1: ...USTRIES Quick Ship WORKMASTER WORK BENCHES IAC INDUSTRIES 3831 S BULLARD AVE GOODYEAR AZ 85338 Phone 714 990 8997 Fax 714 990 0557 www iacindustries com QS Workmaster REV 042318P65 Assembly Instructio...

Page 2: ...ter Leg Extender Kit 16 ESD Grounding Cleaning PLEASE NOTE Quick Ship Accessories include assembly instructions in their own packaging when packed by individually Please look for these instructions wh...

Page 3: ...If the assembly is going to take more than one day all individual hardware pieces should be returned to a central location Check all parts and hardware kits against the itemized packing list found wit...

Page 4: ...422 if parts are missing HARDWARE KIT QS HWR0078 1 4 20x3 4 Hex Head Bolt 1 4 Flat Washer 5 16 18x3 4 Hex Head Bolt Beam Connector Plate HARDWARE KIT COMPONENTS Description Qty 1 4 20 x 3 4 Hex Head B...

Page 5: ...nd securing the frame support beams to the work surface Step 2 Place worksurface top side down on smooth flat surface being sure to protect it from damage by foreign objects IAC recommends the use of...

Page 6: ...inserts in the worksurface as this could cause the insert to pull out Step 4 Slide the workbench leg extender into the pedestal tube making sure the plastic insert in the end of the leg extender is ex...

Page 7: ...DO NOT TIGHTEN THIS HARDWARE Step 2 Connect the support beam to the riser boxes using the 1 4 20 x 75 hex head bolts 1 4 flat washers and 1 4 20 keps nuts Align support beam ends with holes in riser b...

Page 8: ...nto each hole Tighten at this time Install plastic caps where needed Note For SESIS Panels CAUTION Risk of Electric Shock Do NOT plug into another Relocatable power tap STEP 4 Carefully turn instrumen...

Page 9: ...ten Install the appropriate light tube It is a good idea to test the light at this time by plugging it in and turning it on and off If the light tube does not light please double check that the power...

Page 10: ...down when bench is upright 3 Hold the unistrut nut against the inside of the cross brace and attach the footrail tube with a 1 4 20 x 1 00 hex bolt split washer and flat washer on each end The footrai...

Page 11: ...r the top of the worksurface while fitting the lower flange of the TE2 mounting brackets under the worksurface Looking under the worksurface align the slots in the TE2 mounting brackets with the inser...

Page 12: ...install drawer bracket and drawer s while bench in upside down Step 1 Install rear mounting bracket as shown on below drawings using hardware listed above Note The position of your bracket will be det...

Page 13: ...press down on the right side tab and pull on drawer body Step 4 With the drawer removed from the case place the case over the front beam and the drawer mounting bracket as shown Use supplied hardware...

Page 14: ...mechanism close the spring loaded Red locking mechanism by turning the switch up or down depend on what side your setting position until the Red locking mechanism closes Switch Before installing the...

Page 15: ...g sure the threaded holes on the plate caster leg extender tube are on the same side as the holes in the pedestal tube Align the threads of the leg extender with the holes in the pedestal tube and sel...

Page 16: ...ly and that the ESD material is working properly Cleaning ESD Materials ESD laminates are designed to resist abrasion scuffing scorching and most solvents Intense exposure to any of these conditions c...

Reviews: