3.3.1.
Remove the access
panel to reveal air filter
cover.
3.3.2.
Undo the nut (anti-
clockwise) and remove the
air cleaner cover and take
out the element.
3.3.3.
Clean the air filter.
3.3.4.
Reattach the air filter
cover and screw on the
nut.
3.4.
Checking the Generator before start up.
•
Be sure to turn off the main breaker switch before starting. The
generator should be earthed to prevent electric shocks.
•
Turn off the main breaker switch and remove all loads.
•
Before starting the engine, be sure to switch OFF any appliances
connected to it.
•
Ensure that the breaker switch is OFF before switching between
115v/230v.
3.5.
Running-in periods of Operation.
3.5.1.
The first 20 hours are the break-in period of the engine. For this reason, it is
important to follow the following instructions during this period.
3.5.1.1.
Warm up the engine 5 minutes after the initial starting, before applying load.
3.5.1.2.
Avoid applying loads above 3kw during the first 20 hours of operation.
3.5.1.3.
It is important to replace the engine oil on time.
3.5.1.4.
Replace the engine oil whilst the engine is warm, after 20-hours running.
3.5.1.5.
Ensure that old engine oil is drained out completely.
Page 14
Rev 3
Summary of Contents for DHY6000LR
Page 2: ...Page 2 Rev 3 ...
Page 11: ...2 MACHINELAYOUT Page 11 Rev 3 ...
Page 23: ...11 WIRINGDIAGRAM 11 1 N B Subject to change without prior notice Page 23 Rev 3 ...
Page 25: ...12 SERVICE RECORD SHEET Date Hours Maintenanceundertaken Name Page 25 Rev 3 ...
Page 29: ...NOTES Page 29 Rev 3 ...
Page 30: ...NOTES Page 30 Rev 3 ...
Page 31: ...NOTES Page 31 Rev 3 ...