Mast
Table of Contents
TABLE OF CONTENTS
General ...............................................................................................................................................................
Safety Procedures When Working Near Mast..................................................................................................
Load Backrest Extension, Carriage, Load Rollers, Side Rollers, and Forks ..................................................
Load Backrest Extension, Remove and Install ............................................................................................
Carriage Assembly, Remove and Install.......................................................................................................
Carriage Load Rollers, Remove and Install .................................................................................................
Side Rollers, Disassemble and Assemble .....................................................................................................
Fork, Replace .................................................................................................................................................
Hook-Type Forks .......................................................................................................................................
Remove ..................................................................................................................................................
Install.....................................................................................................................................................
Two-Stage Mast Assembly.................................................................................................................................
Remove ...........................................................................................................................................................
Clean and Inspect ..........................................................................................................................................
Lift Cylinders, Remove and Install Dual-Lift Cylinders .............................................................................
Lift Cylinder, Remove and Install Single Main-Lift Cylinders ...................................................................
Remove.......................................................................................................................................................
Install .........................................................................................................................................................
Inner Mast Assembly, Remove and Install...................................................................................................
Hoses, Replace ...............................................................................................................................................
Hose and Cable Sheaves, Replace ................................................................................................................
Two-Stage Lift Chains ...................................................................................................................................
Remove and Install ...................................................................................................................................
Clean and Inspect......................................................................................................................................
Two-Stage Chain Sheave, Remove and Install ............................................................................................
Load Rollers and Wear Plugs, Remove and Install......................................................................................
Two-Stage Mast Assembly, Install................................................................................................................
Three-Stage Mast Assembly..............................................................................................................................
Three-Stage Mast Assembly, Remove...........................................................................................................
(C210), and V30ZMD (D210/E210) Only .............................................................
Clean and Inspect ..........................................................................................................................................
Free-Lift Cylinder, Remove and Install........................................................................................................
Main Cylinders (Standard), Remove and Install .........................................................................................
(C210) and V30ZMD (D210/E210), Remove and Install...............
Inner and Intermediate Mast Assemblies, Remove and Install .................................................................
Hoses, Replace ...............................................................................................................................................
Hose and Cable Sheaves, Replace ................................................................................................................
Free-Lift Hose Sheave...............................................................................................................................
Carriage Sheaves.......................................................................................................................................
Three-Stage Lift Chains, Remove and Install..............................................................................................
General.......................................................................................................................................................
Free-Lift Chains ........................................................................................................................................
Main-Lift Chains .......................................................................................................................................
Three-Stage Chain Sheaves, Disassemble and Assemble ...........................................................................
Free-Lift Chain Sheaves ...........................................................................................................................
Main-Lift Chain Sheaves ..........................................................................................................................
Load Rollers and Wear Plugs, Remove and Install......................................................................................
Three-Stage Mast Assemble, Install ............................................................................................................
Mast Operation Check .......................................................................................................................................
Hydraulic System Leaks Check ........................................................................................................................
Lift Chains Check ..............................................................................................................................................
©2008 HYSTER COMPANY
i
Summary of Contents for MAST N30XMH
Page 14: ...Two Stage Mast Assembly 4000 SRM 482 Figure 10 Two Stage Mast Assembly Dual Lift Cylinders 10 ...
Page 27: ...4000 SRM 482 Three Stage Mast Assembly Figure 18 Three Stage Mast Assembly 23 ...
Page 34: ...Three Stage Mast Assembly 4000 SRM 482 Figure 21 Hose and Cable Assemblies Outer Weldment 30 ...
Page 51: ......