
15
Installation:
Automated Load Management
ALM (Automated Load Management) Testing
1. Isolate the supply to the Hypervolt & remove the cover.
2. Locate the ALM setting dial (10) in the bottom left corner of the PCB
(Printed Circuit Board).
3. Set the ALM dial to “2”. Take care to set the dial correctly, note that it
comes from the factory set to “0”.
4. Replace the cover and turn the power back on.
5. Plug the Hypervolt into your EV testing adaptor and set the adaptor to
"C" (Car Charging), the bolt on the front of the charger will go green.
6. Turn on the customers kettle to increase house load to above 10A.
7. Watch that the green bolt on the front of the Hypervolt decreases.
8. Turn the kettle off and check the green bolt extends back.
9. Isolate the supply to the Hypervolt & remove the cover.
10. Set the ALM dial (10) back to the required load setting (60A is 6, 80A is 7
& 100A is 8). You might choose to set this to 60A even if the main fuse is
100A.
11. Replace the cover and turn the power back on.
ALM will not function if the CT clamp is not fitted.
Top tip
: It is a good idea to carry a basic amp measuring clamp meter with
you as part of your installer kit. This way you can measure the amperage
being drawn by the property to confirm it starts under 10A.
11