background image

 

 

 

 

REV X ABC0123 

REV A MTD 2065 

ii.  If it fails it will give you an error, record this or pull it from the Log File. Turn 

off the machine for 5 min and reboot, then run the test again. 

3.  Complete the BAX Install Checklist and attach to the equipment record in CRM. 

 

Swap of Q7 Cycler ONLY 

1.  Follow Pre-Installation Site Requirements and Unpacking and Installation Sections 

prior to swap out. 

 

2.  Before removing the BAX® Q7 to be swapped out, insert the plastic shipping tray 

(this should have been saved from the time of install) and use the manual block 
control in the diagnostics>cycler tab to raise the block, power down the machine 
without lowering the block. This secures the block for shipping. 

a.  If the shipping tray is not available, one will be in the new BAX® System Q7. To 

remove that tray, connect the BAX® System Q7 to a power source and turn on the 
machine. This will automatically lower the block, an audible sound will occur, and the 
In-Use light will turn off when the block is lowered. Open the drawer and remove the 
shipping tray. 

 

3.  Swap the BAX® System Q7 units by disconnecting the USB and power cables and 

reconnecting them to the new machine. Power on the unit and immediately remove 
the plastic shipping tray. 

a.  Cycle startup lights follows – Error, Power, In-Use, Error, Power 

i.  if it stays on there is problem, try powering down and restarting, if that doesn’t 

work contact Diagnostics Support. 

b.  The drawer will unlock when the “in use” light goes off, open the drawer and 

immediately remove the plastic block inside the machine. Keep this on site for the 
client in the box with the backup drivers, I like to write “backup BAX® supplies” on it. 

 

4.  Power on the computer and launch the BAX® System Q7 software. This will prompt 

that a new machine is connected, click ok, then import the calibration data. 

a.  Remove the calibration data CD from the back of the newly connected BAX® 

Reviews: