INSTALLATION AND OPERATING INSTRUCTIONS
2. Mount the blocked vent switch in the rear of the
boiler on the draft hood as shown in Figure 7.2.
3. Mount the flame rollout switch as shown in Figure 7.3.
4. Mount the ignition module as shown in Figure 7.4.
C. INSTALL CONTROL WIRING
1. Wire the boiler according to the wiring diagram
supplied with the boiler (in the Control Envelope).
Figures 7.5 to 7.7 are provided for reference only.
2. Install all line voltage wiring in approved electrical
conduit.
3. Do not install single pole switches, including safety
controls, in the neutral leg.