![hydrotab 1500BT Manual Download Page 12](http://html1.mh-extra.com/html/hydrotab/1500bt/1500bt_manual_2192445012.webp)
12
Hydro
Tab
Marine Engineering
Interceptor Installation
17
18
M4,8x25
Attention!
The anodes replacement, depends on the sea water quality you have dropped anchor. As the
corrosion of an anode looks like a sponge, for more efficient checking you should touch it to feel that its
smooth surface has become porous. We suggest a precautionary monthly inspection and replacement
before anodes mass is worn over 50%.