4
INSTALLATION
The Hydro-Quip “Slide” series control offers the ultimate in installation flexibility. The heater
can be installed at the bottom, top, back, or remotely up to 60”* away allowing for full
coverage of all installation variations. *Requires the purchase of optional heater assembly.
If installing with optional “L-shaped” heater, follow back installation below. Hydro-Quip
assumes the person installing this control system is a qualified Service Professional and is
familiar with their local codes and regulations.
Slide Configurations
Remove control box and heater assembly from
carton and verify contents for completeness.
For a bottom installation
of heater loosen the 2ea.
3/8” nuts on the adjustable clamps then loosen the
adjustable clamps just enough as to move freely.
Slide the heater between the feet placing the studs
from the adjustable clamps into the slots provided
on the feet and tighten the 2ea 3/8” nuts, then
tighten the adjustable clamp.
For Bottom Back Installation
utilize the back of
the feet brackets, loosen the adjustable clamps just
enough as to move freely. Remove 2ea 3/8” nuts.
Align the 2 studs with the slots on the back of the
feet bracket. Reinstall 2ea 3/8” nuts, and tighten.
Finish by tightening the adjustable clamps with the
box rotated as explained on page 5.
Summary of Contents for PLATINUM PS-9003
Page 1: ...PS 9003 PS 9004 PLATINUM SERIES INSTALLATION OPERATION GUIDE ...
Page 2: ......
Page 22: ...20 NOTES ...
Page 23: ......
Page 24: ...06 09 Rev 1 2 ...