24
Rev. 07142020
STEP 6(c): INSTALL TANK CROSS BEAM ASSEMBLY
Part #
Parts Required (Per Tank)
HH
-
LPL
-
1026
BEAM STRAP—ALUMINUM –HARBORHOIST
HH
-
LPL
-
1018
CROSS CHANNEL
-
I BEAM 84 inch*
HH
-
4310
CROSS CHANNEL
-
3IN SQ. 100IN. V CEN-
TER*
FRM
-
06
-
0007
CROSS CHANNEL
-
3IN SQ. V CENTER 126
IN LONG*
Part #
Hardware Required (Per Tank)
HH
-
1975
BRASS HEX NUT 3/8
-
16
2090242
FLAT WASHER
3/8”
SS
HH
-
LPL
-
1505
LOCK WASHER 3/8
-
16 SS
HH
-
LPL
-
1508
WASHER
-
FLAT
-
1/2" x 2 OC SS
1.
Connect the facing tanks by placing the Cross Channels on top of the Support Channels between the U
-
Bolts. Install the Beam Strap to the tank frame assemblies.
2.
Finger
-
tighten the U
-
Bolt nuts to hold the Beam Strap in place. Repeat for each set of tanks.
Do not fully tighten until you verify that Step 6(a), 6(b), and 6(c) have been completed.
Support Channel
Beam Strap
3/8
-
16 Brass Hex Nut
3/8”
SS Flat Washer
3/8”
SS Lock Washer
Cross Channel *
THE CROSS CHANNEL END SHOULD HAVE AT LEAST 2 INCHES OF CHANNEL VISIBLE BEFORE GOING UNDER
THE BEAM STRAP.
End of Cross Channel
(2”
visible minimum)
* Use Chart 4 to determine proper Cross Channel for model of lift