COMPLETE BATHTUB INSTALLATION
Fill tub with water to the overflow and then drain the
tub while inspecting the waste connections below the
floor for leaks. Access from below will be necessary for
this step (Figure 8).
15
FIGURE 8
5
•
Rough In Dimensions – For critical dimensions, we suggest taking the measurements of the actual tub on site.
All
printed specifications are +/- ½ inch and subject to change without notice.
•
The tub must be level
.
•
Determine final location of the tub. Tub will sit on top of finished flooring.
•
Ensure location is structurally sound, flat and level.
•
Align the tub in a manner that the drain lines up with the P-trap in the floor. DO NOT LET THE TUB REST ON THE
DRAIN PLUMBING.
•
Check the tub for level. It must be level end to end and side to side.
•
Caulk the gap between the skirt and the floor.
ELECTRICAL REQUIREMENTS
WARNING:
When using electrical products, basic precautions should always be followed, including the fol owing:
DANGER:
RISK OF ELECTRICAL SHOCK. Connect only to a circuit protected by a ground fault circuit interrupter.
Grounding is required. All electrical connections should be made by a licensed electrician. Installation of Hydro
Systems bathtubs must meet all applicable codes and regulations.
– 1 HP Blower - A dedicated 120v 20 amp GFCI protected electrical circuit is required for tubs with the standard 1 HP
120v Blower.
INSTALLATION INSTRUCTIONS