Hydro-
Action
®
Initial Service Policy
Our company, _______________________________________ will provide a two-year initial
service policy, which will provide for inspection and service of your
Hydro-
Action
®
plant. The
policy will include the following:
• Four inspection/service calls (at least one every six (6) months) over the two (2) year period
including inspection, adjustment and servicing of the mechanical electrical and other applicable
component parts to ensure proper function. This includes inspecting OPS
®
, air pump, air filter,
diffuser operation, and cleaning and replacing or repairing any component not found to be
functioning correctly.
• An effluent quality inspection consisting of a visual check for color, turbidity, scum overflow
and examination for odors.
If any improper operation is observed that cannot be corrected at that time you shall be notified
immediately in writing of the conditions and the estimated date of correction.
At the conclusion of the initial service policy, our company will make available, for purchase on
an annual basis, a continuing service policy to cover labor for normal inspection, maintenance
and repair.
Owner/user operation instructions must be strictly followed or warranties are subject to
invalidation.
Pumping of sludge build-up from the plant, if necessary, is not included in these services.
Owner:
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Date:_______________________________
Service Dealer:
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Date:_______________________________
Summary of Contents for AP Series
Page 1: ......
Page 15: ...Appendix 3 Technical Manual for Timers Grasslin 24 Hr Timer Omeron Micro Dose Timer ...
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ...Appendix 5 Drawings AP 500 ATU LPA 500 ATU AP 600 ATU AP 750 ATU AP 1000 ATU AP 1500 ATU ...