COMMISSIONING
After all installation procedures are finished, the luminaire operation needs to be verified.
Follow the instructions below and pay attention to the state of the led indicators:
1. Switch on the luminaire power supply. In that time red indicator LED should not light and the green one should light constantly or blink.
2. Turn off the luminaire power supply. The luminaire will go automatically into emergency operation; the indication LEDs should remain
switched off. The light source should light.
3. Switch power supply again – the luminaire should work as in first point.
4. For the luminaire with the SM operation mode, with the fixed phase switched on, switch on the supply voltage of the switching phase
and verify that the luminaire lighting source is working.
5. Perform the battery forming procedure.
BATTERY FORMING
To ensure the battery long lifespan perform a forming procedure.
After installation and commissioning follow below instructions:
1. Switch on luminaire power supply. The battery will be charged. During this period no voltage blackouts should occur.
2. After 36 hours turn off luminaire power supply. The luminaire will go automatically into emergency operation and will operate for up to
two hours over the rated emergency operation time.
3. Switch the power supply back on.
4. After 36 hours turn off the power supply. The luminaire will switch to emergency operation again and will operate until the battery is
fully discharged.
5. Turn the luminaire power supply back on.
6. The luminaire will be ready for operation after 24 hours.
MAINTENANCE
Luminaire should be cleaned with a damp cloth according to building maintenance plan.
Do not use abrasive cleaners, solvents, substances and cleaning agents containing alcohol to clean the light source.
The light source used in this luminaire may only be replaced by the manufacturer, his service agent or a similar qualified person.
After mounting the luminaire on a flat surface, it is necessary to seal the connection between the luminaire and the ceiling (not required,
when the degree of protection IP20 is sufficient).
Battery replacement procedure
if nominal emergency operating time isn’t met (follow the drawings in installation procedure):
1. Switch off the luminaire power supply and remove the cover. Remove two opposite screws that secure carrier plate to the base, then fold
the both parts so that battery is easily accessible.
2. Disconnect the battery from the emergency module and cut the cable tie securing the battery. Peel it off the luminaire base.
3. Replace it with a new one of the same types as on the battery label. Fit a new cable tie.
4. Connect and mount the battery on the emergency module in reverse order to steps 2 and 1.
5. Replace the cover.
6. Perform the battery forming.
STORAGE
The luminaire should be stored no longer than 6 months from the date of purchase, in a dry place with an ambient temperature range of
-10 – +30˚C.
WARRANTY
Warranty is valid and enforceable only when manufacturer’s recommendations are preserved, and the installation and usage are proper.
Warranty is granted for a period of 12 months from the date of sale, unless the luminaire has been sold under different contract conditions.
The warranty is excluded in case of misuse, unsuitable use, wrong connection or mechanical defects of the luminaire caused by the client.