Installation and Maintenance Manual
45
Maintenance Schedule
Barrier Gate Operator Maintenance Schedule
Name of part
What to do
Check at these recommended monthly intervals
1
3
6
12
60
Anchor bolts
Check for tightness
*2
X
Limit Switches
Check for adjustment
*3
X
Fluid level
Check for loss of fluid
*4
X
Hydraulic fluid
Drain and replace fluid
*5
X
Brake Valves
Check for adjustment
*6
X
Clock Battery
Replace
*7
X
Crank Arm Zerk
Lubricate with Grease
X
Special Notes:
*1. Damage to the barrier arm is usually the result of vehicular contact with the arm. Contact with the
arm can also cause the crankshaft bearings to become loose or cracked if the contact force is great
enough. This is not a warranty Issue.
*2. Confirm that the anchor bolts are tight and that the chassis hadn’t shifted, which can also happen with
vehicle contact to the operator.
*3. Check to see that the limit cams are tight and that they contact the limit switches enough to trip them
but not crushing the limit switches.
*4. The oil level should remain approximately one inch below the filler hole. See maintenance instructions
for oil filling. Loss of fluid is not normal and indicates a leak that must be located and repaired. The cap
for the filler hole is a breather and needs only to be finger tight. Use “Uniflow” fluid, part
H004 1.0
, if
additional fluid is required.
*5. To drain the hydraulic oil, leave the arm in the closed position, and disconnect the hydraulic hose
where it connects to the top of the hydraulic cylinder. Place the disconnected hose into a waste
receptacle and start the gate in the open direction. All of the oil will drain within 15 seconds. Stop the
pump immediately, when the flow ceases. Re-connect the loose hose. Refill with new UNIFLOW
hydraulic oil available from the factory, or use a substitute, if performance in cold weather is not a
question.
*6. Confirm that the brake valves are stopping the arm properly, and adjust if needed.
*7. Replace battery with DL 2025 / DL 2032 or CR 2025 / CR2032.
Summary of Contents for HTG 320-2
Page 16: ...Installation and Maintenance Manual 10 Components of the Barrier Arm Gate Operator ...
Page 19: ...Installation and Maintenance Manual 13 ...
Page 20: ...Installation and Maintenance Manual 14 ...
Page 21: ...Installation and Maintenance Manual 15 ...
Page 25: ...Installation and Maintenance Manual 19 ...
Page 41: ...Installation and Maintenance Manual 35 E95 ...
Page 54: ...Installation and Maintenance Manual 48 ...
Page 55: ...Installation and Maintenance Manual 49 ...
Page 57: ...Installation and Maintenance Manual 51 ...
Page 58: ...Installation and Maintenance Manual 52 Parts Breakout ...
Page 59: ...Installation and Maintenance Manual 53 Parts Breakout ...
Page 60: ...Installation and Maintenance Manual 54 Parts Breakout ...
Page 61: ...Installation and Maintenance Manual 55 Parts Breakout ...
Page 62: ...Installation and Maintenance Manual 56 Parts Breakout ...
Page 63: ...Installation and Maintenance Manual 57 Parts Breakout ...
Page 64: ...Installation and Maintenance Manual 58 Parts Breakout DC Power Supply Battery Pack Components ...