CHAPTER 3
INSTALLATION PROCEDURES.
Checki n g Bas e Found ation As sembl y
IM POR TANT:
For proper alignment, the tabs on the tower
base foundation assembly must correspond
with the tabs on the tower_
During shipment or while in storage, damage
may have resulted to the tabs on the tower
base foundation assembly_
Before installation of this tower, check
proper alignment
of the tabs. To do this, set
the tower horizontally ou two supports. Attach
the base foundation assembly to the tower
using the 3/4" hardware, as shown below.
If the tabs on the base foundation assembly
are out of alignment, use a large hammer to
realign.
Figure 3 Checking Base Foundation
Assembly
Summary of Contents for HG-52SS
Page 2: ......
Page 22: ...Figure 19 Tower Nvi th Call Outs of All Parts 4 ...