8. If using J-Bars, use the specified jacking points to raise the case
• Raise one side of the case first.
• Use as many J-Bars as possible to lift from the base channels
• A minimum of 2 J-Bars is required
• Place Dollies and chock wheels before lifting the other side. Be sure that the dollies are evenly spaced to carry the
weight of the case as demonstrated on page 5
9. If using Floor-jacks or Bottle-jacks, use the recommended lifting points located at the underside of the case
• These points will be visible channels
• Lift simultaneously to place dollies or rollers
Lifting (Cont’d)
DO NOT use Forklift!
May Cause severe damage to
electrical conduit.