Hussmann® Impact™ Hot Food Merchandiser
Installation
17
2. The complete lineup must be leveled to the highest point of the floor. After the first merchandiser
has been set, position the second so the end frames touch.
a. Set a long level (4 foot or more) on the upper front panel of the merchandisers. Adjust case
height by rotating the Adjustable Leg Leveler until the merchandisers are flush and level.
b. Also check each joint area to be sure that the panels of adjoining merchandisers are flush to
each other.