English
– 3
Service journal
Pre-delivery service
1
Charge the battery for 4 hours at max. 3 amp.
2
Fit steering wheel, seat and any optional
equipment.
3
Check and adjust tyre pressure. (60 kPa, 0.6 bar,
9 psi).
4
Adjust cutting unit:
Adjust lift springs (effective weight of cutting unit
should be 12-15kg / 26.5-33 lb).
Adjust cutting unit so that rear edge is about 2-4
mm / 1/8” higher than front edge.
Adjust the cutting unit’s cutting height setting so
that the connection rod is tensed at the lowest
cutting height.
5
Check that the right amount of oil is in the engine.
6
Check that there is oil in the transmission’s oil
tank.
7
Connect battery.
8
Fill with fuel and start engine.
9
Check that machine does not move in neutral.
10 Check:
Forward drive.
Reverse drive.
Operation of blades.
Seat safety switch.
Lif lever safety switch.
The safety switch for the hydrostat pedals.
11 Tell customer about:
Needs and benefits of following the service
schedule.
Servicing and the influence of this journal on the
second-hand value of the machine.
The transmission guarantee is only valid if the
synchronisation of the front and rear wheels has
been checked and adjusted in compliance with
the service schedule. The system will be damaged if
synchronisation is not carried out.
Range of applications for BioClip.
Complete proof of sale etc.
Pre-delivery service carried out. No outstanding problems.
Certified:
_______________________________________________
Date, mileage, stamp, signature
After the first 8 hours
1
Change engine oil
2
Changing the gearbox oil (Only AWD-machines)
Summary of Contents for R 418Ts
Page 46: ......
Page 47: ......
Page 48: ... z WCJ 6y 2012 12 18 z WCJ 6y 1155354 26 Original instructions ...