11 SERVICE WORK ON THE CHASSIS
50
S02014-10
Main work
–
Remove the holder with the malfunction indicator lamp.
–
Open cable holder
1
on the left and detach the wiring har-
ness.
–
Remove screw
2
.
–
Remove screw
3
.
–
Take off the upper triple clamp with the handlebar and set it
aside.
Info
Cover the components to protect them against dam-
age.
Do not kink the cables and lines.
S01907-10
–
Remove O-ring
4
. Remove protective ring
5
.
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
11.10
Installing the lower triple clamp
102146-10
Main work
–
Clean the bearing and sealing elements, check for damage,
and grease.
High viscosity grease (
–
Insert the lower triple clamp with the steering stem. Mount
the upper steering head bearing.
–
Check whether upper steering head seal
1
is correctly posi-
tioned.
–
Slide on protective ring
2
and O-ring
3
.
Summary of Contents for FC 250
Page 1: ...OWNER S MANUAL 2018 FC 250 Art no 3402166en ...
Page 2: ......