![Husqvarna AR19 Operator'S Manual Download Page 31](http://html.mh-extra.com/html/husqvarna/ar19/ar19_operators-manual_173138031.webp)
English – 29
6.
Undo the hex screws, remove them and make
sure not to lose the pulley (3) and the key (4).
7.
Refit the components per the instructions above
(but in reverse order).
8.
Adjust the drive belt and align the pulley (see
chapter ”Maintenance/Replacing and aligning
the drive belt”).
Replacing the engine
1.
Remove the weights to improve access.
2.
Remove the drive guard cover (1).
3.
Remove the drive belt.
4.
Remove the four engine screws (2). Two on
each side.
5.
Remove the engine from the unit.
IMPORTANT INFORMATION
Lawn aerators of model AR25 have two pairs
of shim plates under the engine.
MAINTENANCE
Replacing the clutch cable
1.
Turn off the engine and remove the old clutch
cable.
2.
Insert the new cable through the hole in the rear
of the cowling.
3.
Attach the lower end of the clutch cable to the
mounting on the tensioning pulley spring (see
illustration) and the upper end to the s-hook on
the clutch handle.
4.
Adjust the cable length using the nut so that the
clutch spring stretches 19.1–31.2 mm when the
clutch handle is depressed.
8011-218
8011-134
8011-063
Summary of Contents for AR19
Page 2: ......
Page 40: ...38 English Lubrication schedule LUBRICATION 8011 280 ...
Page 52: ...50 English SERVICE JOURNAL Action Date stamp signature ...
Page 53: ...English 51 SERVICE JOURNAL Action Date stamp signature ...
Page 54: ... SERVICE JOURNAL Action Date stamp signature H r 6 ...
Page 55: ...8011 156 8011 157 8011 158 8011 159 ...
Page 56: ...2001W35 114 00 28 26 H r 6 ...