INSTALLATION RECOMMENDATIONS
Tools Recommended:
•
Safety ladder (most jobs too tall to reach from floor)
•
Carpenter Level
•
Chalk line
Tools Required
•
1/2” Masonry bit (drill holes in floor for post)
•
1/2” wrench or socket (screws for door to the post)
•
¾” wrench or socket (for anchor bolts)
•
Small hammer (to insert drive pins)
Parts Recommended:
•
Floor Anchors (part #H5814 in post kit. ½” x 4-1/4”) Post Shims (Part #H5820 in post kit) INCLUDED
2
•
Floor Anchors (part #H5814 in post kit. ½” x 4-1/4”) Post Shims (Part #H5820 in post kit) INCLUDED
•
Drill Bits (various)
•
Tape measure
•
Safety Items (hardhat, gloves, safety glasses & steel toe work shoes); remove jewelry
Prior to installation:
•
Prior to beginning installation please check bill of lading to make sure that you have all the parts required for the assembly
•
Make sure that the installation area is clear of all obstructions
•
Read thoroughly all the instructions pertinent to your installation
•
The following installation instructions should be used as a guide for installing Husky Rack & Wire EZ WIRE products. Good common
sense and appropriate safety precautions must be used during installations. The product may be unstable during installation;
temporary bracing should be used until all hardware is tightened and the product is properly anchored to the floor. Permanent field
bracing (NOT SUPPLIED) may be installed. Call Factory if installation help is needed. Installation problems arising from job site
conditions should be referred to a professional installer. Refer product assembly questions to Husky Rack & Wire. 800-438-5629.
•
DO NOT CLIMB FENCE DURING OR AFTER INSTALLATION
Summary of Contents for EZ WIRE
Page 1: ...EZ WIRE INSTALLATION INSTRUCTIONS 1...
Page 11: ...DOUBLE SLIDE DOOR 11...
Page 15: ...15...