PROJECT PLANNING
1. Stake out fence from beginning to end.
2. Estimate the levelness of the ground.
3. Start at the
highest side
of the fence line!
4. Dig holes under the post line.
Make sure
the distance between the hole centers is 6'
(1.82m).
3
GENERAL ADVICE ON POST HOLES
POSITIONING GUIDE
5
BRACKETS ASSEMBLY
FIXING FIRST POST
4
Top of
bracket
1
HEIGHT
VERTICAL
C
D
ADD CONCRETE
A. Position the first post at the highest ground point of the fence line!
B. Place 2” (5cm) timbers under the bracket to maintain the gap between the fence and the ground.
C. Check the VERTICAL angle in two directions.
D. Use dry or ready-mix concrete and let it dry for 10 minutes.
Place the first post in the hole, checking that it satisfies ALL the following conditions:
2
Gravel to reduce
frost heave
6” (15 cm)
below frost
line
24” (60 cm) hole depth
B
A
C
B
A
HIGHEST GROUND POINT
For fence sections less than the
standard 6' (1.82m) center-to-center,
simply cut the rails and fence to size
using a power saw with a reinforced
metal blade.
1
2
D
68” (172cm)
POST TOP
TOOLS & MATERIALS
Use a post hole digger, power auger, or shovel to dig a hole 12” (30 cm) in diameter
and 30” (75 cm) deep. Add 6” (15 cm) of gravel
for post drainage. Insert the post in the center
of the post hole. Level the post and press it
firmly into the hole. Fill the remainder of the hole
with concrete according to the manufacturer's
instructions.
A. Fold the positioning guide wings.
B. Positioning guide should be placed 68” (172 cm) from the top of the post.
C. Attach the positioning guide to the post as shown.
D. Place the bracket within the positioning guide hole.
1. Attach three rail brackets (fcb) to one side of the post.
2. Do not assemble brackets on both sides of the post.
3. Place the positioning guide 68”(172 cm) from the top of the post, then place the bracket.
4. Locate all bracket screws (s18b) in the center of the elongated holes on the
bracket for expansion and contraction.
The lip of the bracket should be at the bottom.
68” (172cm)
68” (172cm)
IMPORTANT:
You must read these instructions carefully before you start to assemble this fence. Please carry out the steps in the order set out in these instructions. Keep these instructions
in a safe place for future reference.
GENERAL INFORMATION:
The Keter Fence is easy to install. We incorporate methods and procedures used by professional installers to guide you through to the successful
completion of your fence.
GENERAL ADVICE:
This is a 2 person assembly job. If it is a property line fence, you will want to confirm your property lines
before ordering your fence.The component parts should be checked and laid out in an orderly way, close at hand. Keep all small parts
(screws, etc.) in a bowl so that they do not get lost.
Please keep the tracking number which appears on the box, and refer to this number when calling the service office for questions or complaints.
CARE & MAINTENANCE:
When your fence needs a clean, use a mild detergent solution and rinse with cold clean water.
DO NOT use acetone, abrasive cleaners or other special detergents to clean the fence.
For general support and replacement parts, please contact:
String line
Post hole digger / power auger
Mallet
Work shoes
4 timber stakes
2”x 2”x24” (5cm x 5cm x 60cm)
Concrete / dry mix
cat : 555519
item : EN-V1
www.keter.com
US: # 1-888-374-4262
Canada: # 1-800-661-6721
UK: # 0121-5060008
Other European Countries: # 31-1612-28301
PANEL
(x2)
MIDDLE
RAILS (x1)
(X3)
TOP
RAIL (x1)
BOTTOM
RAIL (x1)
(X3)