Hunter 41 • Getting Underway
13.5
fully adjusting some tension on the sheet to keep the sail
taught.
2. Install the out haul line in the boom with the messenger
line provided and lead from the sheave at the back of the
boom through the lower cringle at the back of the sail and
aft to the end of the casting.
3. Install reefing lines in the boom with the messenger
line provided and lead from the sheave through the rel-
evant cringle at the back of the sail and then down to the
sliding eye on the bottom of the boom. Pull enough slack
into the reef line so that the sail can be fully raised unim-
peded by the reef lines. Tie the mainsail onto the boom
with the sail ties provided.
4. Install the jib sheet onto the jib and lead the sheets
inside the shrouds to the lead blocks on the cabin top and
aft to the jams or winches on the house top. Tie figure
eight knots in the end of the sheets to prevent them from
running back through the jams.
5. Raise and unfurl sails, beginning with the main and
then the jib while powering into the wind. Once each
halyard, is tensioned by the winch, the halyard can be
pushed down into its respective rope clutches and the
halyard removed from the winch, freeing the winch for the
next halyard or sheet. However, care should be taken not
to inadvertently open the rope clutches, since the sails
will lower rapidly if this is done. When the sails are raised,
the boat can be laid off and the engine turned off.
6. Once the main is sheeted in and you are sailing
upwind, confirm the main topping lift position. The main
should be capable of sheeting in hard without the topping
lift being tight. With the main sheeted in hard, the topping
lift should have eight to ten inches of sag and should be
adjusted accordingly.
7. After a day of sailing, the sails should be lowered /
furled in while again powering into the wind, with the jib
furled in first and then by lowering the main. Protect your
sails by covering them with the lazyjack sailcover or furl-
ing them completely up.
13.3.2 Tuning the B&R Rig
The easiest method for tuning the B&R rig is to perform
step one as follows before the mast is stepped, with it
lying aft side down on two sawhorses. Begin with all rig-
ging slack. If the mast is already stepped, loosen all the
rigging, and then proceed to step one.
1. Start with all the rigging slack. Then induce the mast
bend by tightening the reverse diagonals (diamonds).
Measure the band by tensioning a line or the main hal-
yard between the masthead and the gooseneck. The
maximum amount of bend should be no more than 1%
of the length of “P” for the standard rig and no more than
2” (50mm) for the furling mast. Measured perpendicular
from the aft face of the mast to the halyard at the deepest
part of the bend. It can be less than that based on the sail
shape and your own preference. The bend should also
be evenly distributed along the mast to give a smooth
shape. Keep in mind that bending a furling mast may
make it more difficult to furl and will not do much to flat-
ten the sail as in a standard rig. It is very important that
the mast also be straight from side to side at this time.
Tighten or loosen the reverse diagonals to achieve this.
2. Step the mast with all shrouds attached but with the
turnbuckles completely loosened (if the mast was not
already stepped).
3. Attach the jib halyard to a cleat on the bow to support
the mast in a raked position (the masthead should be
about 2’0” (61cm) behind the step). Attach the verticals
and tighten them until you can just see the hole for the
cotter pin in the turnbuckle. Tighten the jib halyard until
you can attach the forestay. At this point, the masthead
should be raked so that a weight hung on the main hal-
yard hangs about 1’ behind the mast step.
4. Use the main halyard to check that the mast is cen-
tered from side to side. Pull it tight and mark the halyard
next to the verticals chainplate. Now do the same in
the other side to see if the marks line up. If not, tighten
and/or loosen the verticals until the marks line up. Once
the masthead is centered, begin tightening the verticals
until the turnbuckles are approximately half closed. While
tightening the verticals, you may notice the bend in the
mast increasing. Now you can tighten the lowers, which
will tend to straighten the lower part of the mast. Be sure
to tighten port and starboard sides evenly.
5. Now you should tighten the headstay until it is approxi-
mately half closed as well. This should induce the approx-
imate amount of headstay tension. Never use anything
more than a pair of wrenches to tighten your rigging. If
you use an extended piece of pipe on the handle of a
wrench, you can over-tighten the rigging and do damage
to the mast or rigging.
6. On the Hunter, it is necessary to go up the mast in a
Bosun’s Chair to tighten the number 2 diagonal shroud
(D2 or intermediate shroud). Always use caution when
“going aloft”. You should always use a mountain climbing
Summary of Contents for H41
Page 1: ...Operator s Operator s Manual Manual H41 H41 V1 021507 P N 1031381 ...
Page 2: ......
Page 9: ...Introduction Introduction H41 H41 Chapter 1 Chapter 1 V1 021507 P N 1031381 ...
Page 14: ...Hunter 41 Introduction 1 6 Notes ...
Page 26: ...Hunter 41 Documents and Forms Maintenance Log Date Maintenance Performed Hourmeter 2 12 ...
Page 27: ...Hunter 41 Documents and Forms 2 13 Date Maintenance Performed Hourmeter Maintenance Log ...
Page 33: ...Hunter 41 Documents and Forms 2 19 Spare Parts List ...
Page 34: ...Hunter 41 Documents and Forms Dates of practice drills and onboard safety inspections 2 20 ...
Page 35: ...Hunter 41 Documents and Forms 2 21 My personal preferences for maintenance items safety gear ...
Page 36: ...Hunter 41 Documents and Forms Notes 2 22 ...
Page 37: ...DC 071609 Limited Limited Warranty Warranty Chapter 3 Chapter 3 ...
Page 38: ...This Page Intentionally Left Blank Hunter Limited Warranty 3 2 ...
Page 47: ...V1 021507 P N 1031381 Boating Boating Safety Safety H41 H41 Chapter 4 Chapter 4 ...
Page 68: ...Notes Hunter 41 Boating Safety 4 22 ...
Page 70: ...Notes Hunter 41 Boating Safety 4 24 ...
Page 71: ...Chapter 5 Chapter 5 Fuel Fuel Systems Systems H41 H41 V1 021507 P N 1031381 ...
Page 77: ...Fig 5 7 A Quick Fuel Filter Reference Hunter 41 Fuel Systems1 5 7 ...
Page 86: ...This Page Intentionally Left Blank Hunter 41 Fuel Systems 5 16 ...
Page 87: ...Underwater Underwater Gear Gear H41 H41 Chapter 6 Chapter 6 V1 021507 P N 1031381 ...
Page 96: ...Hunter 41 Underwater Gear 6 10 Notes ...
Page 98: ...Hunter 41 Underwater Gear 6 12 This Page Intentionally Left Blank ...
Page 99: ...DC Electric DC Electric Systems Systems H41 H41 Chapter 7 Chapter 7 V1 021507 P N 1031381 ...
Page 108: ...Hunter 41 DC Electric 7 10 Notes ...
Page 110: ...Hunter 41 DC Electric 7 12 Notes ...
Page 112: ...Hunter 41 DC Electric 7 14 Notes ...
Page 113: ...AC Electric AC Electric Systems Systems H41 H41 Chapter 8 Chapter 8 V1 021507 P N 1031381 ...
Page 120: ...Hunter 41 AC Electric Systems 8 8 ...
Page 122: ...Hunter 41 AC Electric Systems 8 10 This Page Intentionally Left Blank ...
Page 123: ...Water Water Systems Systems H41 H41 Chapter 9 Chapter 9 V1 021507 P N 1031381 ...
Page 134: ...Hunter 41 Water Systems 9 12 This Page intentionally Left Blank ...
Page 135: ...Waste Waste Systems Systems H41 H41 Chapter 10 Chapter 10 V1 021507 P N 1031381 ...
Page 144: ...Hunter 41 Waste and Sanitation Systems 10 10 ...
Page 146: ...Hunter 41 Waste and Sanitation Systems 10 12 ...
Page 148: ...Hunter 41 Waste and Sanitation Systems 10 14 ...
Page 150: ...Hunter 41 Waste and Sanitation Systems 10 16 ...
Page 152: ...Hunter 41 Waste and Sanitation Systems 10 18 Notes ...
Page 162: ...Hunter 41 Engines and Transmissions 11 10 This Page Intentionally Left Blank ...
Page 163: ...and Sails Sails Rigging H41 H41 Chapter 12 Chapter 12 V1 021507 P N 1031381 ...
Page 171: ...Hunter 41 Sails and Rigging 12 9 1 4 6mm Figure 12 10 Conventional Standing Rigging ...
Page 173: ...Hunter 41 Sails and Rigging 12 11 Figure 12 11 Furling Standing Rigging 3 16 5mm 1 4 6mm ...
Page 176: ...Hunter 41 Sails and Rigging 12 14 Notes ...
Page 177: ...Getting Getting Underway Underway H41 H41 Chapter 13 Chapter 13 V1 021507 P N 1031381 ...
Page 184: ...Hunter 41 Getting Underway 13 8 Notes ...
Page 185: ...Maintenance H41 H41 Chapter 14 Chapter 14 V1 021507 P N 1031381 ...
Page 198: ...Hunter 41 Maintenance 14 14 This Page Intentionally Left Blank ...
Page 199: ...V1 021507 P N 1031381 Glossary Glossary H41 H41 Chapter 15 Chapter 15 ...
Page 205: ...Notes Hunter 41 Glossary 15 7 ...
Page 206: ...Notes Hunter 41 Glossary 15 8 ...