GENESIS OPERATIONS MANUAL
10
2. SET THE SCHEDULE LENGTH, DAY NUMBER, and TIME OF
DAY-CHANGE
Puts the controller in the proper mode for changing the calendar settings. The display shows the
schedule day and length, for example:
Sch length 12/32
(This means day 12 of a 32-day schedule.) The cursor is in the far right position of the schedule length number.
Press the keys for the number of days you want in the schedule (this example shows 28
days). As you enter numbers, previous numbers move to the left.
Completes setting the schedule length setting. The cursor moves to the far right position of the day
number, for example:
Sch day 12/28
Press the keys for the number you want to assign to today in the schedule (this example
shows day 1).
Completes setting the day of schedule. The display shows the current time of day-change, for
example:
Day chg 06 PM_
The cursor is in the far right position of the time number.
Press the number keys for the time you want each irrigation day to change to the next
irrigation day. This feature will allow you to run an entire irrigation cycle within the same
irrigation day.
If necessary, press PM to change back and forth between AM and PM.
Completes the time of day-change setting and restores the time display.
TIP: If you water every day on all programs, create a one-day schedule. Then you are always on Day 1 of a one-
day schedule.