background image

Package No.4

 

 

Roof

 

1

 

2

 

3

 

4

 

1

 

2

 

2

 

1

 

4

 

3

 

701

 

m1

 

681

 

681

 

701

 

681

 

681

 

701

 

751

 

4

 

 

 

 

 

 

 

 

701

 

681

 

713

 

752

 

751

 

a1

 

a2

 

mm

 

3496

 

4190

 

1571

 

3485

 

4179

 

2084

 

400

 

M6x10

 

M6

 

Titan 912

 

1

 

 

8

 

2

 

 

4

 

4

 

44

 

44

 

Titan 914

 

 

1

 

10

 

 

2

 

4

 

5

 

52

 

52

 

All 681 profiles should be preload-
ed with 4 bolts ie: all 681 profiles 
should have 4 free bolts once the 
eave and ridge have been at-
tached. When fitting 713, the full 
length brace, leave one bolt free in 
681 below 713 and two free above 
it. These bolts will be used to con-
nect apex, eave and 713 brace. 
Vent parts 521 also need these 
bolts.

 

7

 

5

 

6

 

8

 

8

 

681

 

5

 

6

 

7

 

701

 

681

 

681

 

681

 

681

 

681

 

713

 

752

 

752

 

701

 

681

 

681

 

752

 

752

 

752

 

713

 

671

 

671

 

Summary of Contents for Titan 912 EB

Page 1: ...Model Titan 912 EB Model Titan 914 EB Titan 912 914 EB Greenhouse Assembly Instructions Hunkin Garden Products Ltd sales hunkin co nz www hunkin co nz Ph 0800 14 48 65...

Page 2: ...ge the customer is charged for the other half The guarantee is invalid if the greenhouse is not assem bled according to these instructions The guarantee does not cover wind snow and storm damage or ot...

Page 3: ...enhouse is assembled by means of the following tools Spirit level Spanner socket spanner 8 and 10 mm Screw driver a battery drill with a clutch is very handy for quicker assembly Caulking gun Peel bac...

Page 4: ...l later Some need to line up with the greenhouse frame and it is much easier to align and concrete them later The base is powder coated green This protects the base from ground salts and makes it far...

Page 5: ...ssembly Used to fasten 712 and 723 1 611 621 641 651 652 661 711 712 a1 a2 m1 m2 723 662 mm 2664 1282 1535 1571 1571 1995 1634 710 M6x10 M6 1623 378 QTY 1 1 2 1 1 2 2 2 28 28 1 2 2 1 4 5 6 7 641 651 7...

Page 6: ...9 2662 1985 1968 M6x10 M6 2009 M6x15 2375 QTY 1 2 1 1 1 2 2 2 27 30 1 2 1 3 1 1 631 641 726 1 2 3 4 5 6 7 8 9 9 654 653 m1 8 654 663 2 3 4 5 6 7 721 726 721 726 631 663 631 665 721 721 721 781 781 641...

Page 7: ...671 722 727 753 a1 a2 mm 3496 4190 1535 3496 4190 2055 2055 400 M6x10 M6 Titan 912 2 8 2 4 4 8 56 56 Titan 914 2 10 2 4 4 10 64 64 1 671 722 2 632 727 5 666 632 722 7 671 722 8 727 632 9 671 666 753...

Page 8: ...les should be preload ed with 4 bolts ie all 681 profiles should have 4 free bolts once the eave and ridge have been at tached When fitting 713 the full length brace leave one bolt free in 681 below 7...

Page 9: ...he bracket screws sup plied Fig 3 8 2 Fit the vent sides 531 to the vent hinge 541 3 Slide in b7 correct side to sun and attach 551 to the sides 531 4 Repeat the procedure for the other vents 5 Slide...

Page 10: ...2 1 1 2 8 2 4 2 2 n1 a1 a2 a5 a6 a9 a11 p11 Size M6x10 M6 3 5x19 3 5x25 M4 M4x25 1967 QTY 8 14 14 20 8 4 4 1 591 591 593 592 582 582 583 583 581 581 591 583 a5 591 594 591 582 a5 a11 a9 n1 581 591 p4...

Page 11: ...ction View 572 621 572 621 791 p5 a5 a1 a2 791 m6 a1 a2 p11 593 6 7 8 9 10 11 12 6 7 8 10 11 9 12 Slide the door rollers into the top rail 572 To get past the frame uprights 661 gently pull the bottom...

Page 12: ...iately to the base while the helpers hold the greenhouse frame Once the frame is secured you are free to glaze at any time Glazing could take up to a day to complete so choose a day where it is going...

Page 13: ...e until they are It is easiest to fit the polycarbonate to the roof first be cause you can put a leg of a ladder through the unclad sides for extra stability if required Have you fitted the roof vents...

Page 14: ...al run before you the sealer on one sheet so you get the hang of it This avoids a mess if you have to pull it out again Page 16 shows you how to insert the pvc locking strips Easy once you know how As...

Page 15: ...ars s to seal off the ends 3 The polycarbonate is treated with UV protection and must therefore be positioned with the text opal side out Remove the plastic protective film from both sides Mark one si...

Page 16: ...il you receive extra PVC locking strips The strips go in quite easily once you know how A few pictures are shown below to make this process a little clearer Run a bead of glue sealer down the vertical...

Reviews: