background image

15 

 

Installing the polycarbonate sheets (see page 16 for more info)

 

mm

 

Titan 912

 

Titan 914

 

b1

 

677x1553/1991

 

4

 

4

 

B2

 

609x2002/2399

 

2

 

2

 

B3

 

609x402/7

 

2

 

2

 

b4

 

572x915

 

4

 

4

 

b5

 

677x1528

 

10

 

12

 

B6

 

677x1573

 

6

 

8

 

b7

 

677x612

 

4

 

4

 

B8

 

677x943

 

4

 

4

 

 

DWG

 

Length

 

Titan 912

 

Titan 914

 

 

DWG

 

Length

 

Titan 912

 

Titan 914

 

Front 

Gable

 

 

 

1534

 

2

 

2

 

Rear 

Gable

 

 

 

1534

 

2

 

2

 

1994

 

2

 

2

 

1994

 

2

 

2

 

380

 

2

 

2

 

2002

 

2

 

2

 

726

 

2

 

2

 

2380

 

2

 

2

 

807

 

2

 

2

 

726

 

2

 

2

 

s

 

 

585

 

2

 

2

 

807

 

2

 

2

 

660

 

2

 

2

 

s

 

 

592

 

2

 

2

 

f

 

 

12

 

12

 

12

 

660

 

2

 

2

 

Roof

 

 

 

938

 

8

 

8

 

f

 

 

12

 

12

 

12

 

1570

 

12

 

16

 

Side

 

wall

 

c

 

 

1534

 

20

 

24

 

s

 

 

660

 

16

 

20

 

s

 

 

660

 

20

 

24

 

f

 

 

12

 

30

 

36

 

f

 

 

12

 

60

 

72

 

1

 

2

 

3

 

4

 

Panel

 

Panel

 

Panel

 

Assemble b5 Panel

 

3.BOTTOM

 

2

 

1. TOP

 

4

 

Assemble b1&B2 Panel

 

5.SIDE

 

Installing the polycarbonate. 

 

1. Only neutral silicone is to be used for mounting polycarbonate. Silicone is used between the frame and polycarbonate 

on the vertical parts of the roof and walls. The very low weight of polycarbonate requires you to press the sheets firmly 
into the silicone to ensure a good glue line. The polycarbonate sheets should be secured with the PVC locking strips (c) 
or spring clips. PVC locking strips have the better wind resistance.

 

2. The polycarbonate is delivered with both ends open. Use the capping bars (s) to seal off the ends.

 

3. The polycarbonate is treated with UV protection and must therefore be positioned with the text / opal side out. Remove 

 

  the plastic protective film from both sides. Mark one side with a felt pen so you don’t get confused.

 

4. If you need more silicone glue use SIKA “Fix it Fast” sealer. For high wind areas ADOS MS High performance adhesive 

sealant is the best choice. More expensive than SIKA, but a lot stronger. Available from Mitre 10 Mega, Bunnings etc.

 

5. Polycarbonate sheets must not come into contact with the ground to prevent ingress of dirt and moisture between the 

walls. Always rest them on cardboard or similar material during construction. 

 

6. 

Important: 

The polycarbonate greenhouse should be protected against strong winds until the silicone has completely 

set. 

 

(f ) aluminium clip 

 

 

(f ) 

Aluminium 

 clip 

(f ) aluminium clip 

Fitting PVC 

locking strips 

(s) 

PVC 

cap 

(s) 

PVC 

cap 

(s) PVC cap 

(f) from outside 

(s) 

PVC 

cap 

PVC  capping  bars  (U  shaped)  are  put 
over  the  ends  of  the  sheet  (top  and bot-
tom)  to  stop  moisture  and  bugs  from 
getting into the twin  wall portions of the 
polycarbonate.  Capping  bars  have  the 
part  number  “s”  and  come  in  various 
lengths. In some places the shape of the 
extrusions are designed to cap it for you, 
so it does not apply in every case. Doors 
and  vents  for  instance.  A  capping  bar 
will  not  fit  into  an  extrusion  if  it  is  not 
meant to, so it is self -evident. 

Summary of Contents for Titan 912 EB

Page 1: ...Model Titan 912 EB Model Titan 914 EB Titan 912 914 EB Greenhouse Assembly Instructions Hunkin Garden Products Ltd sales hunkin co nz www hunkin co nz Ph 0800 14 48 65...

Page 2: ...ge the customer is charged for the other half The guarantee is invalid if the greenhouse is not assem bled according to these instructions The guarantee does not cover wind snow and storm damage or ot...

Page 3: ...enhouse is assembled by means of the following tools Spirit level Spanner socket spanner 8 and 10 mm Screw driver a battery drill with a clutch is very handy for quicker assembly Caulking gun Peel bac...

Page 4: ...l later Some need to line up with the greenhouse frame and it is much easier to align and concrete them later The base is powder coated green This protects the base from ground salts and makes it far...

Page 5: ...ssembly Used to fasten 712 and 723 1 611 621 641 651 652 661 711 712 a1 a2 m1 m2 723 662 mm 2664 1282 1535 1571 1571 1995 1634 710 M6x10 M6 1623 378 QTY 1 1 2 1 1 2 2 2 28 28 1 2 2 1 4 5 6 7 641 651 7...

Page 6: ...9 2662 1985 1968 M6x10 M6 2009 M6x15 2375 QTY 1 2 1 1 1 2 2 2 27 30 1 2 1 3 1 1 631 641 726 1 2 3 4 5 6 7 8 9 9 654 653 m1 8 654 663 2 3 4 5 6 7 721 726 721 726 631 663 631 665 721 721 721 781 781 641...

Page 7: ...671 722 727 753 a1 a2 mm 3496 4190 1535 3496 4190 2055 2055 400 M6x10 M6 Titan 912 2 8 2 4 4 8 56 56 Titan 914 2 10 2 4 4 10 64 64 1 671 722 2 632 727 5 666 632 722 7 671 722 8 727 632 9 671 666 753...

Page 8: ...les should be preload ed with 4 bolts ie all 681 profiles should have 4 free bolts once the eave and ridge have been at tached When fitting 713 the full length brace leave one bolt free in 681 below 7...

Page 9: ...he bracket screws sup plied Fig 3 8 2 Fit the vent sides 531 to the vent hinge 541 3 Slide in b7 correct side to sun and attach 551 to the sides 531 4 Repeat the procedure for the other vents 5 Slide...

Page 10: ...2 1 1 2 8 2 4 2 2 n1 a1 a2 a5 a6 a9 a11 p11 Size M6x10 M6 3 5x19 3 5x25 M4 M4x25 1967 QTY 8 14 14 20 8 4 4 1 591 591 593 592 582 582 583 583 581 581 591 583 a5 591 594 591 582 a5 a11 a9 n1 581 591 p4...

Page 11: ...ction View 572 621 572 621 791 p5 a5 a1 a2 791 m6 a1 a2 p11 593 6 7 8 9 10 11 12 6 7 8 10 11 9 12 Slide the door rollers into the top rail 572 To get past the frame uprights 661 gently pull the bottom...

Page 12: ...iately to the base while the helpers hold the greenhouse frame Once the frame is secured you are free to glaze at any time Glazing could take up to a day to complete so choose a day where it is going...

Page 13: ...e until they are It is easiest to fit the polycarbonate to the roof first be cause you can put a leg of a ladder through the unclad sides for extra stability if required Have you fitted the roof vents...

Page 14: ...al run before you the sealer on one sheet so you get the hang of it This avoids a mess if you have to pull it out again Page 16 shows you how to insert the pvc locking strips Easy once you know how As...

Page 15: ...ars s to seal off the ends 3 The polycarbonate is treated with UV protection and must therefore be positioned with the text opal side out Remove the plastic protective film from both sides Mark one si...

Page 16: ...il you receive extra PVC locking strips The strips go in quite easily once you know how A few pictures are shown below to make this process a little clearer Run a bead of glue sealer down the vertical...

Reviews: