1 Introduction
Assembling
1.1 General
information
This equipment should be installed, inspected, maintained and operated in ac-
cordance with EN1176-7 guidelines.
Before installation work commences, please check that you have all of
the equipment and fixation components in the parts list provided (see
Tables 3-1 and 3-2).
Please consider that the installation has to be carried out only on even
terrain (max.slope up to 3%).
Any spare parts that may be required can be obtained directly from your sup-
plier.
Please do not hesitate to call your supplier
if you have any problems during
installation or in case of any other questions.
Following installation, complete assembly instructions, maintenance in-
structions and a maintenance record must be sent to the operator who
must confirm receipt in writing. See the last page of this document.
All nuts and bolts are hot-dip galvanised or stainless steel.
One of the characteristics of stainless steel is that uncontrolled cold weld-
ing may occur when the nuts are tightened. To prevent this, it is neces-
sary to spray the nuts and bolts with Teflon spray or another similar lubri-
cant.
2
We hereby confirm that this play equipment has been tested
and certified in accordance with the play equipment standard
EN 1176.