HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen
•
www.huck.net
Seiltechnik
E:\Huck\Montageanleitungen\Englisch\4592-10S-01-en-001.doc
- 37 -
14 Hand
over
document
Art.-Nr.: 4592-10
Type of item:
Sixt von Armin
Serial number: _____________________________________________
Customer or operator (Town, Town council, Kindergarten, etc.):
___________________________________________________________
___________________________________________________________
Competent person in charge:
___________________________________________________________
___________________________________________________________
Installation company (address):
___________________________________________________________
___________________________________________________________
Responsible assistant (assembler):
___________________________________________________________
___________________________________________________________
Received the complete assembly instructions, maintenance instructions and
maintenance printout .
___________________________________________________________
(Signature of operator)
(Signature of installation company)
(Stamp)
Date:_________________________
After the installation of the equipment pass the installation and mainte-
nance documents to the operator. The operator has to receive the hand
over documents. The complete filled and signed hand over document
should be sent to the supplier.