HUCK Seiltechnik GmbH - Dillerberg 3
– 35614 Asslar-Berghausen
[email protected] - www.huck.net
\\CAD1\Standard\4591-50-9\Montageanleitung\Easy_Swing_Schaukelbett_4591_50_9_ST_B_L_1_GBR.doc
28
11 Monthly maintenance
11.1 Check the spaces between the equipment and the ground (clearance and
height of fall).
11.2 Check the ground surface of fall protection for hard objects and loose
foundations.
11.3 Check all connecting elements and fittings for wear and tear and tighten
if necessary. Replace damaged or missing parts.
11.4 Check that moving metal parts (joints, springs, etc.) move smoothly and
are not worn. Replace if necessary.
11.5 Check all attachments such as chains, ropes, nets, etc. for damage and
replace if necessary.
11.6 Check rubber parts, sleeves, etc. for wear and tear or damage and
replace if necessary.
11.7 Check the surface of wooden parts for damage caused by the weather or
external influences and mould. Repair or replace if necessary.
11.8 Check the surface of plastic and metal parts, e.g. slides, for damage and
replace if necessary.
12 Quarterly maintenance
12.1 Detailed inspection of the operation and stability of the equipment
paying particular attention to any wear and tear.
12.2 Tighten all types of fastenings.
12.3 Repaint and retreat surfaces.
12.4 Maintenance of fall protection surfaces.
12.5 Check height of fall protection material and fill up with loose filling
material if necessary! If the posts are marked, fill up correspondingly.
12.6 Retighten bolts.
13 Half-yearly maintenance
13.1 The stability of supporting posts, braces, foundations etc. has to be
checked. Once repair respectively replacement is completed, the entire
equipment has to be verified.