Annual Maintenance 

 

13     Annual maintenance  

13.1  Ascertaining  that  the  equipment,  foundations  and  surfaces  are  safe  for 

operation. 

13.2  In particular, the equipment should be checked for decay and corrosion. 

It may be necessary to dig out or excavate certain components in order 
to do so. Zinc paint should be applied to corroded areas and scratches. 

 

.

 

The equipment must be inspected by someone 

with the necessary 

expertise

 in strict compliance with the instructions issued by Huck 

Seiltechnik GmbH. 

A copy of the inspection record should be given to the operator, 
who must confirm receipt.

 

 

 

Summary of Contents for Eagles Nest Tree

Page 1: ...Eagles Nest Tree Art No 4652 40 Height 5 74 m Required Safety Surfacing 400 mm Rubber Wood Chip Pea Gravel etc Operator _____________________________________________________ Location ________________...

Page 2: ...2 von 40 Revision history Revision 0 2014 02 07 The first allowed version Assembly Instructions Revision 5 2019 01 21 Zwei Ketten hinzu f r Leiter FH All rights reserved Copyright 2014 Huck Seiltechni...

Page 3: ...4 Installation 13 5 Post installation checks 27 B Maintenance Instructions Eagles Nest Tree 29 Art 4652 40 29 6 Introduction Maintenance 31 7 General maintenance information 32 8 Maintenance timetable...

Page 4: ...sitate to call your supplier if you have any problems during installation or in case of any other questions Following installation complete assembly instructions maintenance instructions and a mainten...

Page 5: ...articles which are serving for the further development of our articles and are reasonable for the customer Measurement tolerances Because of the properties and characteristics of the components minor...

Page 6: ...manufacturer 6 Name and overall dimension of the largest component 1x Steel post length 6 20m 193 7 mm 7 Name and weight of the heaviest component 1x Steel post approx 157 kg 8 Intended age group 6 y...

Page 7: ...e surface measure of foundations have to be enlarged for about 50 10 Assembly time once foundations completed 7 hours Required assistants 3 persons 11 Any spare parts which may be required can be obta...

Page 8: ...connection parts 101 12 Bowed shackles 8mm 102 12 Foundation chains 7mm x 700mm 103 8 Nyloc nuts Washers Nut caps M12 104 8 Stainless steel bearing adapter M12 105 8 Post caps 140mm 106 24 Post cap sc...

Page 9: ...Seite 9 von 40 3 2 In symbols Table 3 2 Delivery contents in symbols Pos Quantity Symbol 1 1 2 1 3 1 4 8...

Page 10: ...Seite 10 von 40 Pos Quantity Symbol 5 1 6 1 101 12 102 12 103 8 104 8 105 8 106 24 107 8 108 2 109 8...

Page 11: ...Seite 11 von 40 Pos Quantity Symbol 110 1 112 1 113 2 sets 1 sewer pipr 250 mm 0 85 m long from the customer...

Page 12: ...Seite 12 von 40 Loctite Thread locking adhesive Glue all screws nuts and sleeves with Loctite not less than 5 drops except for Nylock nuts...

Page 13: ...Seite 13 von 40 4 Installation...

Page 14: ...Seite 14 von 40 Foundation sizes...

Page 15: ...Seite 15 von 40 Foundation plan...

Page 16: ...Seite 16 von 40...

Page 17: ...Seite 17 von 40 Foundation depths Play component alignment 7 7 6 5 3 2 8...

Page 18: ...Seite 18 von 40 Installation...

Page 19: ...Seite 19 von 40...

Page 20: ...Seite 20 von 40...

Page 21: ...Seite 21 von 40...

Page 22: ...Seite 22 von 40 5 3 4 2 1 110 0 3 3 WH MMNS...

Page 23: ...Seite 23 von 40...

Page 24: ...Seite 24 von 40 2 2...

Page 25: ...tics of wood it is normal that shrinking and swelling occur due to heat and moisture For example a wood post with a of 180mm can vary between 173mm and 183mm In occurrence it is necessary that bolts a...

Page 26: ...must be provided by customer VO Preassembled SSch After installing and and aligning Pos 3 all bolts must be tightened Position the netting and foundation Round off foundation edges min R 100 mm Sizes...

Page 27: ...e surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 5 3 Removal of all assembly aids Please make sure that all assembly aids have been removed from th...

Page 28: ......

Page 29: ...Seite 29 von 40 B Maintenance Instructions Eagles Nest Tree Art 4652 40...

Page 30: ...von 40 Revision history Revision 0 2014 02 07 The first allowed version Maiantanance Instructions Revision 5 2019 01 21 Zwei Ketten hinzu f r Leiter FH All rights reserved Copyright 2014 Huck Seiltech...

Page 31: ...iece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your supplier This equipment should...

Page 32: ...occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 7 4 Spare parts All spare parts must conform to the manufac...

Page 33: ...ipment use Use of the equipment should be prevented in the event of incomplete installation disassembly maintenance repairs and faults 7 12 Claims liability for faults steel poles Steel posts and foot...

Page 34: ...at more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 8 1 3 Faults that compromise safety In the event of a fault that compromises safety quick...

Page 35: ...Seite 35 von 40 9 Regular maintenance 11 3 12 1 13 1 13 2 10 8 11 3 10 3 10 6 11 1 11 2 11 7 10 3 10 6 11 1 11 2 11 7 10 1 10 2 11 6...

Page 36: ...t footings due to danger of rotting 10 8 Check the surface of wooden parts for damage caused by the weather or external influences and mould Repair or replace if necessary 10 9 Check the surface of pl...

Page 37: ...decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and scratches The equipment must be inspected by some...

Page 38: ..._________________________________________________________________ Customer or operator _____________________________________________________________________________ Town Town council Kindergarten Date...

Page 39: ......

Page 40: ...________ ______________________________________________________________ Competent person in charge ______________________________________________________________ ______________________________________...

Reviews: