Faults
Damages must be repaired as soon as they are detected. If serious
defects that affect the safetyness cannot be repaired straight away, the
playground item must be blocked with immediate effect.
7.10 Loose screws
Loose screws always cause quality problems and put safety at risk.
Therefore, loose screws should always be tightened and checks carried
out to ensure that there are no missing screws.
7.11 Preventing equipment use
Use of the equipment should be prevented in the event of incomplete
installation, disassembly, maintenance, repairs and faults.
7.12 Claims/liability for faults (steel poles)
Steel posts and footings are covered by our guarantee if refular maintenance
is carried out and recorded in writing.
Our general terms and conditions apply. Maintenance of steel poles first takes
place after 3 years. The steel posts must be excavated down to the
concrete foundations and checked for corrosion.
Zinc paint should be applied to any corroded areas and scratches.
Check ropes for abrasion, replace ropes where coating is damaged down the
Steel inlet.
Summary of Contents for Eagles Nest Tree
Page 13: ...Seite 13 von 40 4 Installation...
Page 14: ...Seite 14 von 40 Foundation sizes...
Page 15: ...Seite 15 von 40 Foundation plan...
Page 16: ...Seite 16 von 40...
Page 17: ...Seite 17 von 40 Foundation depths Play component alignment 7 7 6 5 3 2 8...
Page 18: ...Seite 18 von 40 Installation...
Page 19: ...Seite 19 von 40...
Page 20: ...Seite 20 von 40...
Page 21: ...Seite 21 von 40...
Page 22: ...Seite 22 von 40 5 3 4 2 1 110 0 3 3 WH MMNS...
Page 23: ...Seite 23 von 40...
Page 24: ...Seite 24 von 40 2 2...
Page 28: ......
Page 29: ...Seite 29 von 40 B Maintenance Instructions Eagles Nest Tree Art 4652 40...
Page 39: ......