INSTALLATION MANUAL
MASTERLINE Ultimate Power
Page 8 of 11
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the
general handling of these products please contact HUBER+SUHNER.
BASE STATION END OF ASSEMBLY
Step 1
Unwind the whole assembly from the reel and lay the cable to
the end equipment. Use the pulling eye to feed the power cable
through a conduit.
Step 2
Remove gland nut from cable and keep it safe.
Step 3
Feed tails through cabinet/cabin.
Step 4
Mark the “strip-back point” using tape.
Step 5
Feed gland nut over cable to secure to cable entry gland if re-
quired.
Step 6
Remove pulling eye from the cable system and strip cable jacket
off the right position. Remove cable jacket carefully.
Route conductors to their respective termination points and con-
nect.
The conductors are numbered 1 to 12 (black number on white
insulation) or are color coded.
Route the braided copper shielding to earth bonding point and
connect