INSTALLATION MANUAL 

MASTERLINE Ultimate Power 

Page 8 of 11 

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and 

accessories other than the ones recommended herein. Any installation performed by unqualified personnel  voids the product warranty provided by 

HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the 

general handling of these products please contact HUBER+SUHNER. 

 

BASE STATION END OF ASSEMBLY 

Step 1   

Unwind  the  whole  assembly  from  the  reel  and  lay  the  cable  to 
the end equipment. Use the pulling eye to feed the power cable 
through a conduit. 

 

 

Step 2   

Remove gland nut from cable and keep it safe. 

 

Step 3   

Feed tails through cabinet/cabin. 

 

Step 4   

Mark the “strip-back point” using tape. 

 

Step 5   

Feed  gland  nut  over  cable  to  secure  to  cable  entry  gland  if  re-
quired. 

 

Step 6   

Remove pulling eye from the cable system and strip cable jacket 
off the right position. Remove cable jacket carefully.

  

Route conductors to their respective termination points and con-
nect. 

The  conductors  are  numbered  1  to  12  (black  number  on  white 
insulation) or are color coded. 

 

Route  the  braided  copper  shielding  to  earth  bonding  point  and 
connect 

 

Summary of Contents for MASTERLINE Ultimate

Page 1: ...lectrician National laws and regulations must be observed during installation The housing and the components used must be checked for exterior damage prior to installation If the cabling system is def...

Page 2: ...roducts For advice concerning the general handling of these products please contact HUBER SUHNER RRH END OF ASSEMBLY Step 1 Use a smartphone to scan the QR code on the side of the reel The QR code pro...

Page 3: ...y be fore attaching the MLUP connector head to the mounting bracket Step 4 Use a rope to pull up the cable system Check the maximum pulling force at 50 C ambient temperature for 1 hour as specified on...

Page 4: ...r all cable clamps are mounted Step 6 Secure the MLUP connector head on the mounting bracket by tightening the two M6 screws on the bottom left and top right corner Tighten the M6 screws using a torqu...

Page 5: ...to an earth bar with a grounding assembly with minimum 16 mm2 6 AWG cross section Consider the correct order first the grounding wire lug secondly the washer thirdly the spring washer Tighten the M8 e...

Page 6: ...plugging Mating Remove protection caps of the plug Twist 120 the coupling ring of the plug connector to remove protecting cap as shown Note the lock unlock symbol on the coupling ring Remove protecti...

Page 7: ...concerning the general handling of these products please contact HUBER SUHNER Step 12 Ensure smooth routing of all cables from connector head to RRH equipment using HUBER SUHNER cable clamps which are...

Page 8: ...BASE STATION END OF ASSEMBLY Step 1 Unwind the whole assembly from the reel and lay the cable to the end equipment Use the pulling eye to feed the power cable through a conduit Step 2 Remove gland nut...

Page 9: ...Any installation performed by unqualified personnel voids the product warranty provided by HUBER SUHNER All due care and attention must be exercised when performing the installation of these products...

Page 10: ...wer jumper 2 core cable BTS end Multi core power cable conductor color code conductor numbering color code Option 1 Europe Option 2 USA Option 3 USA Option 1 Europe Option 2 USA 1L Brown Black Black 1...

Page 11: ...nel voids the product warranty provided by HUBER SUHNER All due care and attention must be exercised when performing the installation of these products For advice concerning the general handling of th...