INSTALLATION MANUAL 

 

 

Page 5 of 15 

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and 

accessories other than the ones recommended herein. Any installation performed by unqualified personnel  voids the product warranty provided by 

HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the 

general handling of these products please contact HUBER+SUHNER. 

 

Step 9 

Fix the power and fiber optic breakouts with suitable 
HUBER+SUHNER cable clamps. Depending on the number of 
breakouts and if power breakout cables are connectorised or 
not, different cable clamps are needed. Contact H+S sales office 
or see the cable clamp portfolio 
http://www.hubersuhner.com/en/products/fiber-optics to select 
the right cable clamps. 
The first clamps has to be applied 0.5m above the housing. The 
cable has to be fixed straight and in line with the MLEH 
enclosure. Do not bend breakout cable direct after the housing 
exit and avoid side load on the housing exit. 

 
Do not over bend the cables. Minimum bend 
radius for power cable and fiber optic cable is 10 
cm. Avoid side load on the power and fiber optic 
connector.  

 
 

All  connectors  (fiber  optic  and  power)  are  protected  using 
waterproof (IP67) protection caps.  

 

 

 

 

Step 10 

All connectors on the breakout cables are protected with water 
proof (IP67) protection caps. 
 

Do not remove the cap if no jumper cable is 
connected. When removing the cap instently mate 
the plug connector to avoid dirt entering the 
connector. 

 

Summary of Contents for MASTERLINE Extreme Hybrid

Page 1: ...be carried out by an authorized electrician National laws and regulations must be observed during installation The housing and the components used must be checked for exterior damage prior to installation If the cabling system is defective it may not be used HANDLING OF THE CABLING SYSTEM To avoid any damage due to improper installation please keep in mind below points AVOID any additional stress ...

Page 2: ...tached Do not pull side where pulling tube is attached Make sure that the spool can turn freely when unspooling Step 3 Rig a rope to allow cable assembly to be hoisted up Feed the rope through the loop in the braided tube and down onto the cable hoist Pull Assembly up the mast NEVER pull on the divider or the breakout Fiber optic or power itself only pull on the hybrid cable below the divider usin...

Page 3: ... the grounding screw is forward facing The MLEH housing can be pushed into the two clips This must be done by muscle power No tools must be used The plastic tabs must be engaged until the last ratchet teeth Use the large MLEH installation bracket to fix the housing to the mast Mount the MLEH bracket as shown in the picture The distance from the top of the housing to the upper clip is around 9 5 cm...

Page 4: ...tween the cable entry and the first cable clamp The maximum allowed misalignment is 5 or 5 cm at 0 5 m below the cable entry The recommended spacing between the clamps is 1 m Minimum bending radius of the cable is 10x cable diameter Do not remove the rope before all cable clamps are mounted Step 7 Remove the rope from the cable hoist after all cable clamps are mounted Remove the blue braided tube ...

Page 5: ... not different cable clamps are needed Contact H S sales office or see the cable clamp portfolio http www hubersuhner com en products fiber optics to select the right cable clamps The first clamps has to be applied 0 5m above the housing The cable has to be fixed straight and in line with the MLEH enclosure Do not bend breakout cable direct after the housing exit and avoid side load on the housing...

Page 6: ... cables which are marked with labels numbered 1 to 6 12 or 18 Mating Remove protection caps of the plug and extension connectors Connect instantly the jumper cable to avoid ingress of water or dirt Push plug connector slightly into extension connector rotate to find keying position push connector to mate Mated connector snaps in and is fully strain relieved Connect the two protection caps together...

Page 7: ...cables Twist 120 the coupling ring of the socket connector anticlockwise to remove protecting cap as shown Connect the two protection caps together for later reuse Push plug connector slightly and in line into receptacle connector rotate to find keying position twist coupling ring of the plug connector clockwise as shown until you hear and feel a click Align white strip on the plug with the white ...

Page 8: ...dvice concerning the general handling of these products please contact HUBER SUHNER BASE STATION END OF ASSEMBLY Step 1 After unwinding the whole assembly from the reel while handling the assembly make sure to leave the pulling tube as long as possible on the assembly Pulling tube ensures IP65 and gives protection to the FO and DC tails inside Step 2 To remove protective tube hold tube and loosen ...

Page 9: ...oducts please contact HUBER SUHNER Step 6 Feed gland nut over cable to secure to cable entry gland if required Step 7 Unwind black tape at cable butt to reveal rip cord This cord is used to open the cable jacket and gain access to the cable elements within Step 8 Use a screwdriver or similar to cut the cable jacket back to the strip back point marked using the tape Step 9 Remove cable jacket caref...

Page 10: ...optic cable element from the DC tails and from a loop to separate it Step 13 During this process at any stage ensure the fibre optics are not kinked where they exit the cable butt Use tape to protect the FO cable against over bending Do not over bend the cable Minimum bend radius for the fiber optic cable is 8 cm Step 14 Once fiber optic cable is separated from DC wires attach it temporarily to ba...

Page 11: ...R SUHNER Step 19 If earthing is required outside cabinet cabin use universal grounding kit and follow separate instructions NOTE the earthing cable can also come in black Step 20 Store any fibre optic cable over length inside base station by using cable over length storage box which can be mounted on a wall panel or mounted horizontally within an equipment rack Over length box HUBER SUHNER Item no...

Page 12: ...ducts please contact HUBER SUHNER Step 24 All HUBER SUHNER fiber optic assemblies are 100 manufactured in an industrial environment and are governed by standards which are implemented and controlled within the factory environment The fiber optic cable assemblies as well as the fiber optic systems are inspected for insertion loss and the cleanliness of the ferrule end face Factory terminated fiber ...

Page 13: ...e products For advice concerning the general handling of these products please contact HUBER SUHNER FIBRE OPTIC ALLOCATION RRH RRH End Base Station End BBU RRH RRH End Base Station End BBU Connector PIN Connector PIN Connector PIN Connector PIN Q ODC ODC 2 ODC 4 LC Q ODC ODC 2 ODC 4 LC 1 1 1 B 1 7 1 1 B 13 2 2 A 2 2 A 3 B 2 3 B 14 4 A 4 A 2 1 1 B 3 8 1 1 B 15 2 2 A 2 2 A 3 B 4 3 B 16 4 A 4 A 3 1 1...

Page 14: ...k Black 3 White 3 Red Blue Grey White 4 White 4 Green Braided screen Common drain wire 3 Brown Black Black 5 White 5 Orange Blue Grey White 6 White 6 Blue Braided screen Common drain wire 4 Brown Black Black 7 White 7 White Black Blue Grey White 8 White 8 Red Black Braided screen Common drain wire 5 Brown Black Black 9 White 9 Green Black Blue Grey White 10 White 10 Orange Black Braided screen Com...

Page 15: ...d Elina Bunka 2016 04 08 Rev C Step 3 5 6 and Power coding modified Marco Senn 2017 09 11 Rev D Step 5 and 7 modified Marco Senn 2017 09 20 Rev E Step 5 6 7 modified Marco Senn 2017 10 04 Rev F Step 5 and 8 modified Marco Senn 2017 10 26 Rev G step 8 order of lug washer and spring washer step 12 cleaning instruction step 24 cleaning instruction Müller René 2017 12 01 Rev H Step 1 QR code Step 5 ch...

Reviews: