INSTALLING PENDANT MOUNT (See Figure 1, 3, 4, 5, & 6):

1. Install Locknut (Q) onto Pendent threads to the end of the threads.
2. Apply Teflon tape to the male (external) conduit thread of the Pendent (P).
3. Insert wiring from Pendent mounting conduit (P) into Wiring Box (G) of the Yoke Ass’y (H). Conduit end passes through the  
    Yoke Assy Crossmember (C) and into the Wiring Box ¾ Conduit hole.
4. Carefully thread the Yoke Ass’y onto the Pendent conduit (P) via Wiring Box. Use a wrench over the hex shape on the hook   
    casting to tighten it in place.
    CAUTION: Do not twist the hook by using a screwdriver blade – too much force could break the hook.
5. Connect cord wires to the fixture AC Power Input Jumper Cord Ass’y, already factory installed into J-box, with approved wire  
    nuts. See wiring diagram for reference (page 3). Wires and wire nuts can now be pushed back into the fixture/driver housing.  
    Ensure grounding wires within wiring Box are secure.
6. Close out Wiring Box (G) using Cover, Cover Gasket, and Screws provided in hardware kit.
7. Mount the fixture onto the Pendent mounted Yoke Assembly (H) via each rail using 5/16” Screw (J) provided in hardware kit 
    into each pair of Slide Nut (K) already inserted into the rail. Position the mounted Yoke Ass’y according to the centering  
    illustration on page 10. Fine tuning of the final Yoke Ass’y position on the rail may be required to achieve final balance and  
    alignment.
8. Tighten the Yoke Ass’y mounting screws to torque noted in Fig. 3.
9. Install lens option onto each Lightbar, see Figure 9. If wireguard was ordered, lenses will ship installed on fixture.
10. Complete electrical connection by installing AC Input Jumper Cord connector into AC Panel as shown in Figure 5.

INSTALLATION INSTRUCTIONS

Hubbell Lighting, Inc.                                                                                                                            Doc. No. 93062486

A subsidiary of Hubbell Incorporated                                                                                                            Revision  A

701 Millennium Drive • Greenville, SC  29607                                                                                Phone (864) 678-1000

Industrial Lighting

®

FIGURE 5

FIGURA 5

FIGURE 6

FIGURA 6

PAGE 2

WIRING

BOX 

COVER

#8-32 SCREWS

LOCKNUT (Q)

YOKE ASSEMBLY (H)

3/4" CONDUIT

INLET INTO J-BOX

SEAL WITH RTV 

AFTER INSTALL

PENDANT

3/4" RIGID CONDUIT

(P)

HHH (MODULAR HIGHBAY) 

INSTALLATION INSTRUCTIONS 

SEE WARNINGS ON CARTON 

WARNINGS: 

 

Observe all precautions usually followed when dealing with high 

voltage equipment when installing or servicing this light fixture. 

 

Disconnect power before installing or servicing. 

 

The product must be installed in accordance with the applicable 

installation code by a person familiar with the construction and 

operation of the product and the hazards involved. 

 

Protect all wiring connections with approved insulators rated 600V. 

150

O

C.

 

Line voltage must be 120V – 277V to match Fixture voltage 

requirement. 

SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE

 

Upon receipt of this Fixture, thoroughly inspect it for any damage.  

 If any is found, the carrier should be notified and held accountable. 

INSTALLING PENDANT MOUNT (See Figure 1, 3, 4, 5, & 6): 

1.

  Install Locknut (Q) onto Pendent threads to the end of the threads. 

2.

  Apply Teflon tape to the male (external) conduit thread of the 

Pendent (P).  

3.

  Insert wiring from Pendent mounting conduit (P) into Wiring Box 

(G) of the Yoke Ass’y (H). Conduit end passes through the Yoke 

Assy Crossmember (C) and into the Wiring Box ¾ Conduit hole. 

4.

  Carefully thread the Yoke Ass’y onto the Pendent conduit (P) via 

Wiring Box. Use a wrench over the hex shape on the hook casting 

to tighten it in place. 

CAUTION:

 Do not twist the hook by using a screwdriver blade – 

too much force could break the hook. 

5.

  Connect cord wires to the fixture AC Power Input Jumper Cord 

Ass’y, already factory installed into J-box, with approved wire nuts. 

See wiring diagram for reference (page 3). Wires and wire nuts can 

now be pushed back into the fixture/driver housing. Ensure 

grounding wires within wiring Box are secure. 

6.

  Close out Wiring Box (G) using Cover, Cover Gasket, and Screws 

provided in hardware kit. 

7.

  Mount the fixture onto the Pendent mounted Yoke Assembly (H) 

via each rail using 5/16” Screw (J) provided in hardware kit into 

each pair of Slide Nut (K) already inserted into the rail. Position the 

mounted Yoke Ass’y according to the centering illustration on page 

10. Fine tuning of the final Yoke Ass’y position on the rail may be 

required to achieve final balance and alignment. 

8.

  Tighten the Yoke Ass’y mounting screws to torque noted in Fig. 3. 

9.

  Install lens option onto each Lightbar, see Figure 9. If wireguard 

was ordered, lenses will ship installed on fixture. 

10.

  Complete electrical connection by installing AC Input Jumper Cord 

connector into AC Panel as shown in Figure 5. 

FIGURE 4

FIGURA 4

J-BOX

SEALING

GASKET

AC INPUT POWER CORD

FROM WIRING J-BOX

CONNECTED TO DRIVER

MODULE.

FACTORY WIRED

AC INPUT CORD

FROM J-BOX - CONNECT

TO AC INPUT PANEL

ON DRIVER MODULE

Hubbell Lighting, Inc.                                                                                                                            Doc. No. 93062486

A subsidiary of Hubbell Incorporated                                                                                                            Revision  A

701 Millennium Drive • Greenville, SC  29607                                                                                Phone (864) 678-1000

Industrial Lighting

®

FIGURE 5

FIGURA 5

FIGURE 6

FIGURA 6

PAGE 2

WIRING

BOX 

COVER

#8-32 SCREWS

LOCKNUT (Q)

YOKE ASSEMBLY (H)

3/4" CONDUIT

INLET INTO J-BOX

SEAL WITH RTV 

AFTER INSTALL

PENDANT

3/4" RIGID CONDUIT

(P)

HHH (MODULAR HIGHBAY) 

INSTALLATION INSTRUCTIONS 

SEE WARNINGS ON CARTON 

WARNINGS: 

 

Observe all precautions usually followed when dealing with high 

voltage equipment when installing or servicing this light fixture. 

 

Disconnect power before installing or servicing. 

 

The product must be installed in accordance with the applicable 

installation code by a person familiar with the construction and 

operation of the product and the hazards involved. 

 

Protect all wiring connections with approved insulators rated 600V. 

150

O

C.

 

Line voltage must be 120V – 277V to match Fixture voltage 

requirement. 

SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE

 

Upon receipt of this Fixture, thoroughly inspect it for any damage.  

 If any is found, the carrier should be notified and held accountable. 

INSTALLING PENDANT MOUNT (See Figure 1, 3, 4, 5, & 6): 

1.

  Install Locknut (Q) onto Pendent threads to the end of the threads. 

2.

  Apply Teflon tape to the male (external) conduit thread of the 

Pendent (P).  

3.

  Insert wiring from Pendent mounting conduit (P) into Wiring Box 

(G) of the Yoke Ass’y (H). Conduit end passes through the Yoke 

Assy Crossmember (C) and into the Wiring Box ¾ Conduit hole. 

4.

  Carefully thread the Yoke Ass’y onto the Pendent conduit (P) via 

Wiring Box. Use a wrench over the hex shape on the hook casting 

to tighten it in place. 

CAUTION:

 Do not twist the hook by using a screwdriver blade – 

too much force could break the hook. 

5.

  Connect cord wires to the fixture AC Power Input Jumper Cord 

Ass’y, already factory installed into J-box, with approved wire nuts. 

See wiring diagram for reference (page 3). Wires and wire nuts can 

now be pushed back into the fixture/driver housing. Ensure 

grounding wires within wiring Box are secure. 

6.

  Close out Wiring Box (G) using Cover, Cover Gasket, and Screws 

provided in hardware kit. 

7.

  Mount the fixture onto the Pendent mounted Yoke Assembly (H) 

via each rail using 5/16” Screw (J) provided in hardware kit into 

each pair of Slide Nut (K) already inserted into the rail. Position the 

mounted Yoke Ass’y according to the centering illustration on page 

10. Fine tuning of the final Yoke Ass’y position on the rail may be 

required to achieve final balance and alignment. 

8.

  Tighten the Yoke Ass’y mounting screws to torque noted in Fig. 3. 

9.

  Install lens option onto each Lightbar, see Figure 9. If wireguard 

was ordered, lenses will ship installed on fixture. 

10.

  Complete electrical connection by installing AC Input Jumper Cord 

connector into AC Panel as shown in Figure 5. 

FIGURE 4

FIGURA 4

J-BOX

SEALING

GASKET

AC INPUT POWER CORD

FROM WIRING J-BOX

CONNECTED TO DRIVER

MODULE.

FACTORY WIRED

AC INPUT CORD

FROM J-BOX - CONNECT

TO AC INPUT PANEL

ON DRIVER MODULE

Summary of Contents for TRIPLE H

Page 1: ...n familiar with the construction and operation of the product and the hazards involved Protect all wiring connections with approved insulators rated 600V 150 C Line voltage must be 120V 277V to match...

Page 2: ...hook casting to tighten it in place CAUTION Do not twist the hook by using a screwdriver blade too much force could break the hook 6 Connect cord wires to the fixture AC Power Input Jumper Cord Ass y...

Page 3: ...IGURE 5 FIGURA 5 FIGURE 6 FIGURA 6 PAGE 2 WIRING BOX COVER 8 32 SCREWS LOCKNUT Q YOKE ASSEMBLY H 3 4 CONDUIT INLET INTO J BOX SEAL WITH RTV AFTER INSTALL PENDANT 3 4 RIGID CONDUIT P HHH MODULAR HIGHBA...

Page 4: ...igure 7 and 8 WARNING NOTICE AIRCRAFT CABLE KIT TYPE SHIPPED WITH YOUR ORDER 2mm KIT FOR LOWBAY SERIES ONLY 3mm KIT FOR HIGHBAY SERIES ONLY 1 Install AC Mounting Bracket R onto each corner of the rail...

Page 5: ...TION INSTRUCTIONS Hubbell Lighting Inc Doc No 93062486 A subsidiary of Hubbell Incorporated Revision C 701 Millennium Drive Greenville SC 29607 Phone 864 678 1000 Industrial Lighting PAGE 1 SEE TABLE...

Page 6: ...E RED BLUE RED BLUE WHITE BLACK WHITE BLACK R E D W H T B L K R E D W H T B L K R E D W H T B L K GREEN BLACK WHITE Hubbell Lighting Inc A subsidiary of Hubbell Incorporated 701 Millennium Drive Green...

Page 7: ...HITE BLACK WHITE BLACK R E D W H T B L K R E D W H T B L K R E D W H T B L K GREEN BLACK WHITE Hubbell Lighting Inc A subsidiary of Hubbell Incorporated 701 Millennium Drive Greenville SC 29607 Indust...

Page 8: ...l Lighting PAGE 9 HHH WIRING DIAGRAMS Doc No 93062486 Revision A Phone 864 678 1000 GROUND GREEN LINE HOT BLACK COMMON NEUTRAL WHITE BLACK WHITE RED FUSING FUSING SINGLE FUSE OPTION DOUBLE FUSE OPTION...

Reviews: