INSTALLING PENDANT MOUNT (See Figure 1, 3, 4, 5, & 6):
1. Install Locknut (Q) onto Pendent threads to the end of the threads.
2. Apply Teflon tape to the male (external) conduit thread of the Pendent (P).
3. Insert wiring from Pendent mounting conduit (P) into Wiring Box (G) of the Yoke Ass’y (H). Conduit end passes through the
Yoke Assy Crossmember (C) and into the Wiring Box ¾ Conduit hole.
4. Carefully thread the Yoke Ass’y onto the Pendent conduit (P) via Wiring Box. Use a wrench over the hex shape on the hook
casting to tighten it in place.
CAUTION: Do not twist the hook by using a screwdriver blade – too much force could break the hook.
5. Connect cord wires to the fixture AC Power Input Jumper Cord Ass’y, already factory installed into J-box, with approved wire
nuts. See wiring diagram for reference (page 3). Wires and wire nuts can now be pushed back into the fixture/driver housing.
Ensure grounding wires within wiring Box are secure.
6. Close out Wiring Box (G) using Cover, Cover Gasket, and Screws provided in hardware kit.
7. Mount the fixture onto the Pendent mounted Yoke Assembly (H) via each rail using 5/16” Screw (J) provided in hardware kit
into each pair of Slide Nut (K) already inserted into the rail. Position the mounted Yoke Ass’y according to the centering
illustration on page 10. Fine tuning of the final Yoke Ass’y position on the rail may be required to achieve final balance and
alignment.
8. Tighten the Yoke Ass’y mounting screws to torque noted in Fig. 3.
9. Install lens option onto each Lightbar, see Figure 9. If wireguard was ordered, lenses will ship installed on fixture.
10. Complete electrical connection by installing AC Input Jumper Cord connector into AC Panel as shown in Figure 5.
INSTALLATION INSTRUCTIONS
Hubbell Lighting, Inc. Doc. No. 93062486
A subsidiary of Hubbell Incorporated Revision A
701 Millennium Drive • Greenville, SC 29607 Phone (864) 678-1000
Industrial Lighting
®
FIGURE 5
FIGURA 5
FIGURE 6
FIGURA 6
PAGE 2
WIRING
BOX
COVER
#8-32 SCREWS
LOCKNUT (Q)
YOKE ASSEMBLY (H)
3/4" CONDUIT
INLET INTO J-BOX
SEAL WITH RTV
AFTER INSTALL
PENDANT
3/4" RIGID CONDUIT
(P)
HHH (MODULAR HIGHBAY)
INSTALLATION INSTRUCTIONS
SEE WARNINGS ON CARTON
WARNINGS:
Observe all precautions usually followed when dealing with high
voltage equipment when installing or servicing this light fixture.
Disconnect power before installing or servicing.
The product must be installed in accordance with the applicable
installation code by a person familiar with the construction and
operation of the product and the hazards involved.
Protect all wiring connections with approved insulators rated 600V.
150
O
C.
Line voltage must be 120V – 277V to match Fixture voltage
requirement.
SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE
Upon receipt of this Fixture, thoroughly inspect it for any damage.
If any is found, the carrier should be notified and held accountable.
INSTALLING PENDANT MOUNT (See Figure 1, 3, 4, 5, & 6):
1.
Install Locknut (Q) onto Pendent threads to the end of the threads.
2.
Apply Teflon tape to the male (external) conduit thread of the
Pendent (P).
3.
Insert wiring from Pendent mounting conduit (P) into Wiring Box
(G) of the Yoke Ass’y (H). Conduit end passes through the Yoke
Assy Crossmember (C) and into the Wiring Box ¾ Conduit hole.
4.
Carefully thread the Yoke Ass’y onto the Pendent conduit (P) via
Wiring Box. Use a wrench over the hex shape on the hook casting
to tighten it in place.
CAUTION:
Do not twist the hook by using a screwdriver blade –
too much force could break the hook.
5.
Connect cord wires to the fixture AC Power Input Jumper Cord
Ass’y, already factory installed into J-box, with approved wire nuts.
See wiring diagram for reference (page 3). Wires and wire nuts can
now be pushed back into the fixture/driver housing. Ensure
grounding wires within wiring Box are secure.
6.
Close out Wiring Box (G) using Cover, Cover Gasket, and Screws
provided in hardware kit.
7.
Mount the fixture onto the Pendent mounted Yoke Assembly (H)
via each rail using 5/16” Screw (J) provided in hardware kit into
each pair of Slide Nut (K) already inserted into the rail. Position the
mounted Yoke Ass’y according to the centering illustration on page
10. Fine tuning of the final Yoke Ass’y position on the rail may be
required to achieve final balance and alignment.
8.
Tighten the Yoke Ass’y mounting screws to torque noted in Fig. 3.
9.
Install lens option onto each Lightbar, see Figure 9. If wireguard
was ordered, lenses will ship installed on fixture.
10.
Complete electrical connection by installing AC Input Jumper Cord
connector into AC Panel as shown in Figure 5.
FIGURE 4
FIGURA 4
J-BOX
SEALING
GASKET
AC INPUT POWER CORD
FROM WIRING J-BOX
CONNECTED TO DRIVER
MODULE.
FACTORY WIRED
AC INPUT CORD
FROM J-BOX - CONNECT
TO AC INPUT PANEL
ON DRIVER MODULE
Hubbell Lighting, Inc. Doc. No. 93062486
A subsidiary of Hubbell Incorporated Revision A
701 Millennium Drive • Greenville, SC 29607 Phone (864) 678-1000
Industrial Lighting
®
FIGURE 5
FIGURA 5
FIGURE 6
FIGURA 6
PAGE 2
WIRING
BOX
COVER
#8-32 SCREWS
LOCKNUT (Q)
YOKE ASSEMBLY (H)
3/4" CONDUIT
INLET INTO J-BOX
SEAL WITH RTV
AFTER INSTALL
PENDANT
3/4" RIGID CONDUIT
(P)
HHH (MODULAR HIGHBAY)
INSTALLATION INSTRUCTIONS
SEE WARNINGS ON CARTON
WARNINGS:
Observe all precautions usually followed when dealing with high
voltage equipment when installing or servicing this light fixture.
Disconnect power before installing or servicing.
The product must be installed in accordance with the applicable
installation code by a person familiar with the construction and
operation of the product and the hazards involved.
Protect all wiring connections with approved insulators rated 600V.
150
O
C.
Line voltage must be 120V – 277V to match Fixture voltage
requirement.
SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE
Upon receipt of this Fixture, thoroughly inspect it for any damage.
If any is found, the carrier should be notified and held accountable.
INSTALLING PENDANT MOUNT (See Figure 1, 3, 4, 5, & 6):
1.
Install Locknut (Q) onto Pendent threads to the end of the threads.
2.
Apply Teflon tape to the male (external) conduit thread of the
Pendent (P).
3.
Insert wiring from Pendent mounting conduit (P) into Wiring Box
(G) of the Yoke Ass’y (H). Conduit end passes through the Yoke
Assy Crossmember (C) and into the Wiring Box ¾ Conduit hole.
4.
Carefully thread the Yoke Ass’y onto the Pendent conduit (P) via
Wiring Box. Use a wrench over the hex shape on the hook casting
to tighten it in place.
CAUTION:
Do not twist the hook by using a screwdriver blade –
too much force could break the hook.
5.
Connect cord wires to the fixture AC Power Input Jumper Cord
Ass’y, already factory installed into J-box, with approved wire nuts.
See wiring diagram for reference (page 3). Wires and wire nuts can
now be pushed back into the fixture/driver housing. Ensure
grounding wires within wiring Box are secure.
6.
Close out Wiring Box (G) using Cover, Cover Gasket, and Screws
provided in hardware kit.
7.
Mount the fixture onto the Pendent mounted Yoke Assembly (H)
via each rail using 5/16” Screw (J) provided in hardware kit into
each pair of Slide Nut (K) already inserted into the rail. Position the
mounted Yoke Ass’y according to the centering illustration on page
10. Fine tuning of the final Yoke Ass’y position on the rail may be
required to achieve final balance and alignment.
8.
Tighten the Yoke Ass’y mounting screws to torque noted in Fig. 3.
9.
Install lens option onto each Lightbar, see Figure 9. If wireguard
was ordered, lenses will ship installed on fixture.
10.
Complete electrical connection by installing AC Input Jumper Cord
connector into AC Panel as shown in Figure 5.
FIGURE 4
FIGURA 4
J-BOX
SEALING
GASKET
AC INPUT POWER CORD
FROM WIRING J-BOX
CONNECTED TO DRIVER
MODULE.
FACTORY WIRED
AC INPUT CORD
FROM J-BOX - CONNECT
TO AC INPUT PANEL
ON DRIVER MODULE