Installation Instructions
A191
For Outdoor Semi-Flush 36-5605 & 36-5605F
Page 2 of 2
Hand-Forged,
Vermont-Made Lighting and Accessories
P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
21174
2.
Slip outer glass (I) over spider assembly (J).
3.
Raise spider assembly (J) with outer glass (I) installed and slip over socket (H) aligning holes in the top of the
spider assembly (J) keyed ring goes over screws (G).
4.
Turn spider assembly (J) counter clockwise until it stops. Tighten three screws (G) until snug against the spider
assembly.
Be careful not to over tighten.
To Install Inner Glass
(Figure 3)
Component Parts
F Glass Retaining Ring (2)
K Inner Glass
1.
Slip inner glass (K) over socket.
2.
Thread the first retaining ring (F) onto socket until it is against top of the inner
glass (K).
3.
Thread the second retaining ring (F) onto socket until it is snug against the first
retaining ring.
Do not over tighten.
4.
Install light bulb
. “F” version bulb is included.
5.
Restore electricity at main breaker.
If you need further assistance, or find that you are missing any parts, please contact the dealer from which you purchased
this product. We hope you enjoy your fixture!
* Hubbardton Forge will not be liable for injury or damage caused by improper installation, lamping or use of this fixture.
(Figure 3)